InteliLite 9 Global Guide
93
Image 5.18 Breaker fail - breaker close/open opens
When binary output breaker close/open closes there is 2 sec delay for breaker fail detection.
Image 5.19 Breaker fail - breaker close/open closes
5.4.13 Exercise timer
The exercise (general-purpose) timer in controller is intended for scheduling of any operations such as e.g.
periodic tests of the gen-set, scheduled transfer of the load to the gen-set prior to an expected disconnection of
the mains etc.
Related setpoints for timer 1 are:
Timer 1 First Occur. Date (page 216)
Timer 1 First Occur. Time (page 216)
Timer 1 Repeated Day In Week (page 220)
Timer 1 Repeat Day In Month (page 220)
Timer 1 Repeat Week In Month (page 221)
Содержание InteliLite 9
Страница 17: ...InteliLite 9 Global Guide 17 Image 3 2 MRS application overview 6 back to Applications overview ...
Страница 41: ...InteliLite 9 Global Guide 41 4 4 12 Example of AMF Wiring ...
Страница 42: ...InteliLite 9 Global Guide 42 4 4 13 Example of MRS Wiring ...
Страница 80: ...InteliLite 9 Global Guide 80 Image 5 11 Flowchart of start of diesel engine ...
Страница 101: ...InteliLite 9 Global Guide 101 5 4 15 Flowchart Image 5 26 Basic flowchart of controller sequences ...
Страница 173: ...InteliLite 9 Global Guide 173 Image 8 7 Idle Time 1 Image 8 8 Idle Time 2 6 back to List of setpoints ...