InteliLite 9 Global Guide
343
LBO: R
Related FW
1.1.0
Related applications
AMF
Comm object
324
Description
The output is closed if the gen-set is ready to start automatically and take the load if the mains fails, i.e.:
the controller is in AMF operating mode
the controller is in AUTO controller mode and
no red alarm is present in the alarmlist
when the red alarm is confirmed during Stop Valve and other requirements are fulfilled then the LBO is
still inactive until the state ready
Ready To AMF
back to Logical binary outputs alphabetically
Related FW
1.1.0
Related applications
AMF, MRS
Comm object
58
Description
The output is closed whenever the GCB is closed or can be closed i.e. the stabilization phase is finished, the
gen-set is running and the
Minimal Stabilization Time (page 174)
timer has elapsed.
and the gen-set voltage and frequency are within limits.
If GCB is open then gen-set voltage and frequency must be in limits.
If GCB is close then gen-set voltage and frequency can be out of limits, but protection delay can’t be count
down. If gen-set voltage and frequency will return into limits until delay is count down then output is still
closed.
Ready To Load
back to Logical binary outputs alphabetically
Related FW
1.1.0
Related applications
AMF, MRS
Comm object
62
Description
The binary output is closed, when the engine is stopped and it is possible to start it i.e. no red alarm is
activated or
is active.
The binary output is switch on when the Ready state occurs.
The binary output is switch off when the Prestart or the Not Ready or the Stop state occurs i.e. always
except Ready state.
Ready
Содержание InteliLite 9
Страница 17: ...InteliLite 9 Global Guide 17 Image 3 2 MRS application overview 6 back to Applications overview ...
Страница 41: ...InteliLite 9 Global Guide 41 4 4 12 Example of AMF Wiring ...
Страница 42: ...InteliLite 9 Global Guide 42 4 4 13 Example of MRS Wiring ...
Страница 80: ...InteliLite 9 Global Guide 80 Image 5 11 Flowchart of start of diesel engine ...
Страница 101: ...InteliLite 9 Global Guide 101 5 4 15 Flowchart Image 5 26 Basic flowchart of controller sequences ...
Страница 173: ...InteliLite 9 Global Guide 173 Image 8 7 Idle Time 1 Image 8 8 Idle Time 2 6 back to List of setpoints ...