Filling the heating system
1.
Check the charge pressure of the
diaphragm expansion vessel.
2.
Close the gas shut-off valve.
3.
!
Important information
Unsuitable fill water
increases the level of depos-
its and corrosion and may
lead to boiler damage.
&
Thoroughly flush the entire
heating system prior to fill-
ing with water.
&
Only use fill water of pota-
ble quality.
&
Soften fill water harder
than 20 °dH (3.58 mmol/l).
For suitable means of
water softening, see the
Vitotec pricelist.
&
An anti-freeze additive sui-
table for heating systems
can be mixed with the fill
water.
Fill the heating system via the boi-
ler fill & drain valve
A
(minimum
system pressure > 0.8 bar).
4.
Close the boiler fill & drain
valve
A
.
Further details regarding the individual steps
7
Initial start-up, inspection, maintenance
56
92
550
GB
Summary of Contents for VITODENS 300 WB3A
Page 10: ...Opening the control unit housing 10 5862 570 GB...
Page 14: ...Closing control unit housing and inserting user interface 14 5862 570 GB...
Page 129: ...Parts lists cont 113 Parts lists 5692 550 GB...
Page 130: ...Parts lists cont 114 Parts lists 5692 550 GB...
Page 131: ...Parts lists cont 115 Parts lists 5692 550 GB...
Page 132: ...Parts lists cont 116 Parts lists 5692 550 GB...
Page 133: ...Parts lists cont 117 Parts lists 5692 550 GB...
Page 145: ...129 5692 550 GB...
Page 146: ...130 5692 550 GB...
Page 147: ...131 5692 550 GB...