Supply (flow)
pressure for nat-
ural gas
Supply (flow)
pressure for
LPG
Remedy
Below 17.4 mbar
Below 42.5 mbar
Do not start up. Notify your mains gas or
LPG supplier.
17.4 to 57.5 mbar
42.5 to
57.5 mbar
Start up boiler.
Above 57.5 mbar
Above 57.5 mbar
Install a separate gas governor down-
stream of the system and regulate the
pressure to 20 mbar for natural gas or
50 mbar for LPG.Notify your mains gas
or LPG supplier.
7.
Shut down the boiler, close the gas
shut-off valve, remove the pressure
gauge, and close test nipple
A
with the screw.
8.
Open the gas shut-off valve and
start the boiler.
Danger
Gas escaping from the test
nipple leads to a risk of
explosion.
Check test nipple
A
for
soundness.
Checking the CO
2
settings
Vitodens 300 is factory-set for natural gas E or LPG P. The natural gas E version
can be converted to natural gas LL using a conversion kit. The LPG P version
can be converted to natural gas E or LL using a conversion kit.
During commissioning or maintenance, check the CO
2
level at the boiler adap-
tor.
Note
The MatriX burner for Vitodens 300 is preset for the entire gas group. Therefore,
the burner requires no further setting or adjustment.
Subject to the Wobbe index, the CO
2
content fluctuates between
Further details regarding the individual steps
(cont.)
14
Initial start-up, inspection, maintenance
56
92
550
GB
Summary of Contents for VITODENS 300 WB3A
Page 10: ...Opening the control unit housing 10 5862 570 GB...
Page 14: ...Closing control unit housing and inserting user interface 14 5862 570 GB...
Page 129: ...Parts lists cont 113 Parts lists 5692 550 GB...
Page 130: ...Parts lists cont 114 Parts lists 5692 550 GB...
Page 131: ...Parts lists cont 115 Parts lists 5692 550 GB...
Page 132: ...Parts lists cont 116 Parts lists 5692 550 GB...
Page 133: ...Parts lists cont 117 Parts lists 5692 550 GB...
Page 145: ...129 5692 550 GB...
Page 146: ...130 5692 550 GB...
Page 147: ...131 5692 550 GB...