3.
Secure the gas supply pipe with a
new gasket.
4.
Check the gas connections for
soundness.
Danger
Escaping gas leads to a risk
of explosion.
Check all fittings for sound-
ness.
5.
Connect the electrical cables/leads
to each corresponding component.
Checking the condensate drain and cleaning the siphon
1.
Check at the siphon, that the con-
densate can freely drain.
2.
Remove the retaining clip and the
siphon.
3.
Clean the siphon.
4.
Fit the siphon and secure with the
retaining clip.
Checking all gas equipment for soundness at operating pres-
sure
Danger
Escaping gas leads to a risk of
explosion.
Check gas equipment for
soundness.
Further details regarding the individual steps
(cont.)
22
Initial start-up, inspection, maintenance
56
92
550
GB
Summary of Contents for VITODENS 300 WB3A
Page 10: ...Opening the control unit housing 10 5862 570 GB...
Page 14: ...Closing control unit housing and inserting user interface 14 5862 570 GB...
Page 129: ...Parts lists cont 113 Parts lists 5692 550 GB...
Page 130: ...Parts lists cont 114 Parts lists 5692 550 GB...
Page 131: ...Parts lists cont 115 Parts lists 5692 550 GB...
Page 132: ...Parts lists cont 116 Parts lists 5692 550 GB...
Page 133: ...Parts lists cont 117 Parts lists 5692 550 GB...
Page 145: ...129 5692 550 GB...
Page 146: ...130 5692 550 GB...
Page 147: ...131 5692 550 GB...