A
Heating flow
B
DHW flow
C
Gas connection
D
DHW return
E
Heating return
F
Expansion vessel
Connect the boiler to the on-site pipe-
work.
Flue gas connection
Connect the balanced flue pipe.
Flue gas system installation
instructions
Condensate connection
Connect the condensate drain with a
pipe air vent valve sloping to the pub-
lic sewer.
Heating water (primary) connection
8
58
62
570
GB
Summary of Contents for VITODENS 300 WB3A
Page 10: ...Opening the control unit housing 10 5862 570 GB...
Page 14: ...Closing control unit housing and inserting user interface 14 5862 570 GB...
Page 129: ...Parts lists cont 113 Parts lists 5692 550 GB...
Page 130: ...Parts lists cont 114 Parts lists 5692 550 GB...
Page 131: ...Parts lists cont 115 Parts lists 5692 550 GB...
Page 132: ...Parts lists cont 116 Parts lists 5692 550 GB...
Page 133: ...Parts lists cont 117 Parts lists 5692 550 GB...
Page 145: ...129 5692 550 GB...
Page 146: ...130 5692 550 GB...
Page 147: ...131 5692 550 GB...