C
DHW cylinder flow G1½"
D
Gas connection
E
DHW cylinder return G1½"
F
Heating return G1½"
G
Expansion vessel
H
Cable arrangement area
K
Recommended dimension
L
Condensate drain
1.
Prepare the water connections.
Thoroughly flush the heating sys-
tem.
2.
Prepare the gas connection
according to TRGI or TRF or all
local regulations.
3.
Prepare the electrical connections.
&
Mains cable: NYM-J 3 x 1.5 mm
2
,
fuse max. 16 A, 230 V~, 50 Hz.
&
Accessory cables: NYM with the
required number of conductors
for the external connections.
&
All cables in area
H
should pro-
trude 1200 mm from the wall.
Preparations for boiler installation
(cont.)
5
58
62
570
GB
Summary of Contents for VITODENS 300 WB3A
Page 10: ...Opening the control unit housing 10 5862 570 GB...
Page 14: ...Closing control unit housing and inserting user interface 14 5862 570 GB...
Page 129: ...Parts lists cont 113 Parts lists 5692 550 GB...
Page 130: ...Parts lists cont 114 Parts lists 5692 550 GB...
Page 131: ...Parts lists cont 115 Parts lists 5692 550 GB...
Page 132: ...Parts lists cont 116 Parts lists 5692 550 GB...
Page 133: ...Parts lists cont 117 Parts lists 5692 550 GB...
Page 145: ...129 5692 550 GB...
Page 146: ...130 5692 550 GB...
Page 147: ...131 5692 550 GB...