Activities before spreading
122
Suppose you would want to spread NPK 16-16-16 from the example
with the features as given in the spreading chart on this page:
With a working width of 18 metres, a driving speed of 8 km/h and a
selected application rate of 22.5 kg/ha.
The required application rate falls beyond the scope of the spreading
chart.
Calculate the required flow rate.
Result: flowrate required = 5.4 kg/min.
Set the discharge point as indicated in the first line of the chart: D.
Calculate the required flowrate with fine application: 3 x 5.4 = 16.2
kg/min.
This value is in the dosing setting: 18+3 (= 21).
Do a manual calibration test to check the flowrate setting.
600
Flowrate required (kg/min) =
18 (m) x 8 (km/h) x 22.5 (kg/ha)
00-30-65-05 1,05 Granular Universal 16 (NPK 16-16-16) Yara
18 mtr
Product
Manufacturer
Yara
285
Granule size
00-30-65-05
235
Density
1,05 kg/ltr
185
Shape
Granular
Field settings
Border spreading
Spreader inclination
0°
Eco
Yield
PTO revolutions
540
PTO revolutions
450
540
Disc revolutions
810
Disc revolutions
675
810
Fine application kit
No
0
°
TrimFlow / Exact Line setting
4 5
Application rate
[kg/ha]
kg/min
kg/min
6
km/h
8
km/h
9
km/h
10
km/h
11
km/h
12
km/h
14
km/h
18+0
4
D
9 52 39 35 31 29 26 22
18+3
7
D
16 91 68 60 54 49 45 39
24+0
10
D
23 129 96 86 77 70 64 55
24+3
13
D
30 167 125 111 100 91 83 71
30+0
16
E
37 205 154 136 123 112 102 88
30+3
20
E
44 243 182 162 146 132 121 104
36+0
23
E
51 281 211 187 168 153 140 120
36+3
29
E
63 349 262 233 209 190 175 150
42+0
34
E
75 417 313 278 250 228 209 179
42+3
40
E
87 486 364 324 291 265 243 208
48+0
46
E
100 554 415 369 332 302 277 237
48+3
52
E
112 622 467 415 373 339 311 267
54+0
59
E
124 691 518 460 414 377 345 296
Universal 16 (NPK 16-16-16)
Summary of Contents for RO-M EW
Page 42: ...Getting familiar with the machine 42 Menu structure...
Page 43: ...Getting familiar with the machine 43...
Page 218: ...Notes 218 Notes...
Page 219: ...Notes 219...