Maintenance
195
Turn the nuts on the 4 fastening bolts so that the dosing
mechanism moves upward.
The dosing mechanism is now higher than the spreading disc and
discharge bushing. Turn the dosing mechanism upwards until you
have good access to the bolts with which the discharge bushing is
attached to the agitator axle star.
Unscrew the bolts attaching the discharge bushing to the star a few
times.
Move the discharge bushing upwards or downwards until the
distance to the spreading disc is 1.0 mm.
Indication
You can also put 1.0 mm thick plates between the discharge bushing
and the spreading disc and lower the discharge bushing onto them.
Turn the bolts with which the discharge bushing is attached to the
agitator axle star.
Check the height again and adjust it if necessary.
Lower the dosing mechanism by turning the fastening bolts
upward.
Lower the dosing mechanism until the bayonet ring has moved
halfway across the bolts with which the discharge bushing is
attached to the star.
Check the position of the dosing mechanism relative to the agitator
axle. The distance between the agitator axle and the sealing ring
must be the same on all sides.
See section »Check the settings of the dosing mechanism« on
page 189.
Turn the lock nuts on the 4 fastening bolts without moving the
dosing mechanism again.
Check that the agitator is not in contact with the bolts attaching the
agitator seal ring.
Reattach the dashboard with the 3 fastening buttons.
Perform the check on the other side as well.
Finally, check the position of the dosing mechanism and the
position of the dosing plate as described in
section »Check the settings of the dosing mechanism« on page
189.
Fastening bolt
Lock nut
Nut
Discharge bushing
Bayonet ring
Bolt
Bolt
Bayonet ring
Discharge bushing
Seal ring
Agitator
Agitator axle
Summary of Contents for RO-M EW
Page 42: ...Getting familiar with the machine 42 Menu structure...
Page 43: ...Getting familiar with the machine 43...
Page 218: ...Notes 218 Notes...
Page 219: ...Notes 219...