
20
Environmental Information
ENERGY STAR
®
Program
Toshiba Tec Corporation, as a member of the ENERGY STAR Program, attaches the ENERGY STAR logo
to all products which meet the ENERGY STAR Program requirements.
The ENERGY STAR Program aims at the promotion of the development and wider usage of office equip-
ment including energy-efficient computers in order to address environmental issues such as global warm-
ing. Manufacturers that participate in this program can attach the ENERGY STAR logo to products after
confirming that they meet the energy saving standards of this program. Also, these standards and logo are
commonly used within the U.S. Environmental Protection Agency (EPA) and participating countries.
Specified products, sales countries or regions may not be included.
To distinguish whether or not the product meets the ENERGY STAR Program requirements, check if the
corresponding logo is on the product.
If you have any questions, contact your service representative.
Summary of Contents for e-Studio 252
Page 1: ...MULTIFUNCTIONAL DIGITAL SYSTEMS Operator s Manual for Basic Function ...
Page 2: ......
Page 6: ...4 CONTENTS Cont ...
Page 86: ...84 2 HOW TO MAKE COPIES 4 Proof Copy Cont 2 ...
Page 89: ...87 3 2 Press the APS button 4 Press the START button ...
Page 101: ...99 3 Name of each Inner Finisher optional 1 Trays 2 Paper stopper MJ 5004 MJ 5005 1 2 1 ...
Page 126: ...124 3 SETTING OF BASIC COPY MODES 6 Copy Density Adjustment Cont 3 ...
Page 127: ...125 4 4 IMAGE ADJUSTMENT 1 Background Adjustment 126 2 Sharpness 127 ...
Page 130: ...128 4 IMAGE ADJUSTMENT 2 Sharpness Cont 4 ...
Page 135: ...133 5 6 Press the ENTER button Select other copy modes as required 7 Press the START button ...
Page 200: ...198 6 e FILING 8 Appendix Cont 6 ...
Page 270: ...268 8 JOB STATUS 6 Error Code Cont 8 ...
Page 279: ...277 9 4 Set a new toner bag and then close the front cover 3 Put the lid on the toner bag ...
Page 302: ...300 9 BLINKING GRAPHIC SYMBOLS 6 Call Service Symbol Cont 9 ...
Page 335: ...333 11 11 MAINTENANCE 1 Daily Inspection 334 2 Simple Troubleshooting 336 ...
Page 342: ...11 340 11 MAINTENANCE ...
Page 360: ...358 INDEX Cont Z Zoom buttons 95 ...