
164
5.USING THE EDITING FUNCTIONS
13.JOB BUILD (Cont.)
5
1
Place the originals of the 1st job.
• When an original is placed on the original glass, one page is regarded as one job.
• To copy mixed-size originals using the Reversing Automatic Document Feeder, see
P.89 “Copying mixed-
size originals in one go (mixed original size)”.
• Select the drawer if you want to specify it.
2
Press the [EDIT] button to enter the edit menu. Then press the [Next]
button to switch the menu, and press the [JOB BUILD] button.
3
Press the [ENTER] button.
• Read the brief description of JOB BUILD on the touch panel.
• JOB BUILD is set and the basic menu is displayed.
Summary of Contents for e-Studio 252
Page 1: ...MULTIFUNCTIONAL DIGITAL SYSTEMS Operator s Manual for Basic Function ...
Page 2: ......
Page 6: ...4 CONTENTS Cont ...
Page 86: ...84 2 HOW TO MAKE COPIES 4 Proof Copy Cont 2 ...
Page 89: ...87 3 2 Press the APS button 4 Press the START button ...
Page 101: ...99 3 Name of each Inner Finisher optional 1 Trays 2 Paper stopper MJ 5004 MJ 5005 1 2 1 ...
Page 126: ...124 3 SETTING OF BASIC COPY MODES 6 Copy Density Adjustment Cont 3 ...
Page 127: ...125 4 4 IMAGE ADJUSTMENT 1 Background Adjustment 126 2 Sharpness 127 ...
Page 130: ...128 4 IMAGE ADJUSTMENT 2 Sharpness Cont 4 ...
Page 135: ...133 5 6 Press the ENTER button Select other copy modes as required 7 Press the START button ...
Page 200: ...198 6 e FILING 8 Appendix Cont 6 ...
Page 270: ...268 8 JOB STATUS 6 Error Code Cont 8 ...
Page 279: ...277 9 4 Set a new toner bag and then close the front cover 3 Put the lid on the toner bag ...
Page 302: ...300 9 BLINKING GRAPHIC SYMBOLS 6 Call Service Symbol Cont 9 ...
Page 335: ...333 11 11 MAINTENANCE 1 Daily Inspection 334 2 Simple Troubleshooting 336 ...
Page 342: ...11 340 11 MAINTENANCE ...
Page 360: ...358 INDEX Cont Z Zoom buttons 95 ...