326
Chapter
6
Wiring Exa
m
p
le
s
(f
or F3
SG-SR)
F3SG-SR
User’s Manual
Input/Output Circuit and Applications
6-2-1-11. Double Break with EDM
[Wiring Example]
When a functional earth is necessary, wire an earth cable according to the example in
Optical Synchronization and EDM Unused
. Also refer to
5-4-4. Functional Earth Connection
for more information.
Timing chart
Reset switch (S2)
Press position switch (S3)
OSSD
T1
min.
T2
min.
T4
min.
T5
min.
T5
min.
T2
min.
T3
min.
T4
min.
T3
min.
Dummy
break
T1
min.
T2
min.
T3
min.
T4
min.
T6
Machine stops
Machine restarts
Feeding
parts
Feeding
parts
Removing
parts
Unintended
block
Dummy
break *
Dummy
break *
T1: Minimum pressing time of reset switch. Configurable from 100 to 500 ms in 100-ms increments by SD Manager 3.
T2: Minimum break time (300 ms)
T3: Minimum unblocked time during the time from removing to feeding parts. T3 = T1
T4: Minimum break time (300 ms)
T5: Minimum pressing time of press position switch. T5 = T1
T6: Wait time until double break is complete (30 s or less)
* When the machine is stopped by unintended block in the middle of pressing of parts, operation of the reset switch (S1) and then double dummy
break are needed for reinitiation of the machine cycle.
Unblocked
Blocked
24V/0V (Brown)
0V/24V (Blue)
Not used (Pink)
PSDI (Gray)
0V/24V (Blue)
Not used (White)
OPERATING RANGE
SELECT INPUT (Yellow) *2
TEST (Black)
24V/0V (Brown)
RESET/EDM
(Yellow)
AUX (Red)
OSSD 1 (Black)
OSSD 2 (White)
F39-JG
C-L
F39-JG
C-D
24 VDC
Wiring for NPN *1
24 VDC
KM1
KM2
S2
S3
S1
0 VDC
KM1
KM2
*4
IN
PLC *3
KM1
KM2
M
Cam
S3
Receiver
Emitter
*1. Reverse the polarity of the power supply when using in the NPN system. Select a PLC of
PNP or NPN type according to the system of your application.
*2. Open or connect the line to 24 VDC if Operating Range Selection is used in Long Mode.
*3. When connecting to the PLC, the output mode must be changed with the SD Manager 3
according to your application. Refer to
Chapter 4 Setting with SD Manager 3
for more
information on setting the functions by the SD Manager 3.
*4. This is the case for a PELV circuit.
*5. Set the function with the SD Manager 3, restore the settings to the F3SG-SR, and perform
wiring according to the wiring diagram.
*6. This wiring example shows light emission stop when connected to 24 VDC with PNP
setting, and light emission stop when connected to 0 VDC with NPN setting. If TEST
switch is not needed, refer to
: Indicates a switch position
Function
Setting
DIP switch
SD Manager 3
EDM
-
[External device monitoring] : Enable *5
Operating Range Selection
Short : Connect the OPERATING RANGE SELECT INPUT line of the emitter to 0 VDC.
PSDI
N/A
[PSDI] : Double break *5
Non-Muting system
Perform wiring according to the wiring diagram.
N/A
[Muting] : Disable *5
External Test used
Connect the TEST line of the emitter to 24V/0V of the emitter via a test switch (NO contact). *6
N/A
[External test signal inversion] : Disable
Optical Synchronization
Do not connect the COM(+) and COM(-) lines of the of emitter and receiver with each other.
S1: Test switch
S2: Reset switch
S3: Press position switch
KM1, KM2: Safety relay with forcibly guided contacts
(G7SA) or magnetic contactor
PLC: Programmable logic controller (Used for
monitoring only. NOT related to safety system.)
M: Motor
Intelligent Tap
Needed *5
Summary of Contents for F3SG-SR Series
Page 1: ...Safety Light Curtain F3SG SR Series User s Manual Man No Z405I E3 01...
Page 18: ...xvi Introduction F3SG SR User s Manual...
Page 156: ...128 Chapter 2 IO Link F3SG SR User s Manual System Operation and Functions...
Page 340: ...312 Chapter 5 Cascade Connection F3SG SR User s Manual Wiring and Installation...
Page 368: ...340 Chapter 7 Maintenance Checklists F3SG SR User s Manual Checklists...
Page 398: ...370 Chapter 8 Revision History F3SG SR User s Manual Appendix...