2LL/2LJ/2LH
1-3-28
U024
HDD formatting
Description
Initializes the hard disk.
Purpose
To initialize the hard disk when replacing the hard disk after shipping.
Caution
In addition, the following settings are also initialized by initializing the hard disk.
System menu (user login administration, job accounting, address book, one-touch keys and doc-
ument box etc.), shortcuts and panel programs
When fully formatted, the following pre-installed software are removed.
Option language, PDF1.7 resource, FMU, weekly timer
Method
1. Press the start key.
2. Select the item.
3. Press [Execute].
4. Press the start key to initialize the hard disk.
5. Turn the main power switch off and on. Allow more than 5 seconds between Off and On.
Item No.
Description
Display
Description
Full
Full format
Data
Data format (the application software are retained)
Service Manual Y113350-5
Summary of Contents for d-COPIA 3500MF
Page 1: ...SERVICE MANUAL Copiers d Copia 3500MF 4500MF 5500MF Code Y113350 5...
Page 4: ...This page is intentionally left blank...
Page 10: ...This page is intentionally left blank...
Page 24: ...2LL 2LJ 2LH 1 1 10 This page is intentionally left blank Service Manual Y113350 5...
Page 242: ...2LL 2LJ 2LH 1 3 180 This page is intentionally left blank Service Manual Y113350 5...
Page 330: ...2LL 2LJ 2LH 1 4 88 This page is intentionally left blank Service Manual Y113350 5...
Page 402: ...2LL 2LJ 2LH 1 5 72 This page is intentionally left blank Service Manual Y113350 5...
Page 432: ...2LL 2LJ 2LH 2 1 26 This page is intentionally left blank Service Manual Y113350 5...
Page 439: ...2LL 2LJ 2LH 2 2 7 45 ppm model 55 ppm model only Y113350 5 Sevice Manual...
Page 541: ...1 1 INSTALLATION GUIDE INSTALLATION GUIDE FOR DOCUMENT PROCESSOR...
Page 576: ...INSTALLATION GUIDE FOR PAPER FEEDER...
Page 589: ...INSTALLATION GUIDE FOR LARGE CAPACITY FEEDER...
Page 604: ...INSTALLATION GUIDE FOR SIDE DECK...
Page 628: ...INSTALLATION GUIDE FOR 1000 SHEETS FINISHER...
Page 641: ...INSTALLATION GUIDE FOR 4000 SHEETS FINISHER...
Page 657: ...INSTALLATION GUIDE FOR FINISHER ATTACHMENT KIT...
Page 671: ...INSTALLATION GUIDE FOR CENTER FOLDING UNIT...
Page 688: ...INSTALLATION GUIDE FOR MAILBOX...
Page 696: ...INSTALLATION GUIDE FOR PUNCH UNIT...
Page 716: ...INSTALLATION GUIDE FOR INNER JOB SEPARATOR...
Page 717: ...1 2 3 A B...
Page 718: ...7 8 4 5 6...
Page 719: ...11 9 10...
Page 720: ...A 1 2 3 2 14 15 12 13 16...
Page 721: ...B 3 2 1 2 19 17 18...
Page 722: ...21 22 20...
Page 723: ...26 27 23 24 28 25...
Page 724: ...30 29...
Page 725: ...INSTALLATION GUIDE FOR RIGHT JOB SEPARATOR...
Page 726: ...5 1 2 3 4 5 7 7 6 A B C A B...
Page 727: ...9 10 11 12 13 14 7 8 C...
Page 728: ...INSTALLATION GUIDE FOR FAX System...