2LL/2LJ/2LH
1-2-26
29. Pass the connector of the key counter
wire through the aperture in the right
upper cover.
30. Refit the right upper cover.
31. Refit the ISU right cover.
32. Close the paper conveying unit.
Figure 1-2-34
33. Connect the key counter signal cable to
the key counter wire.
34. Fit the key counter cover to the
machine using the M4 x 6 screw.
35. Insert the key counter into the key
counter socket assembly.
36. Turn the main power switch on and
enter the maintenance mode.
37. Run maintenance item U204 and select
[Key-Counter] (see page 1-3-97).
38. Exit the maintenance mode.
39. Check that the message requesting the
key counter to be inserted is displayed
on the touch panel when the key coun-
ter is pulled out.
40. Check that the counter counts up as
copies are made.
Figure 1-2-35
Right upper cover
Aperture
Key counter wire
Key counter
cover
Key counter
wire
Key counter wire
Key counter
signal cable
M4 x 6 screw
Service Manual Y113350-5
Summary of Contents for d-COPIA 3500MF
Page 1: ...SERVICE MANUAL Copiers d Copia 3500MF 4500MF 5500MF Code Y113350 5...
Page 4: ...This page is intentionally left blank...
Page 10: ...This page is intentionally left blank...
Page 24: ...2LL 2LJ 2LH 1 1 10 This page is intentionally left blank Service Manual Y113350 5...
Page 242: ...2LL 2LJ 2LH 1 3 180 This page is intentionally left blank Service Manual Y113350 5...
Page 330: ...2LL 2LJ 2LH 1 4 88 This page is intentionally left blank Service Manual Y113350 5...
Page 402: ...2LL 2LJ 2LH 1 5 72 This page is intentionally left blank Service Manual Y113350 5...
Page 432: ...2LL 2LJ 2LH 2 1 26 This page is intentionally left blank Service Manual Y113350 5...
Page 439: ...2LL 2LJ 2LH 2 2 7 45 ppm model 55 ppm model only Y113350 5 Sevice Manual...
Page 541: ...1 1 INSTALLATION GUIDE INSTALLATION GUIDE FOR DOCUMENT PROCESSOR...
Page 576: ...INSTALLATION GUIDE FOR PAPER FEEDER...
Page 589: ...INSTALLATION GUIDE FOR LARGE CAPACITY FEEDER...
Page 604: ...INSTALLATION GUIDE FOR SIDE DECK...
Page 628: ...INSTALLATION GUIDE FOR 1000 SHEETS FINISHER...
Page 641: ...INSTALLATION GUIDE FOR 4000 SHEETS FINISHER...
Page 657: ...INSTALLATION GUIDE FOR FINISHER ATTACHMENT KIT...
Page 671: ...INSTALLATION GUIDE FOR CENTER FOLDING UNIT...
Page 688: ...INSTALLATION GUIDE FOR MAILBOX...
Page 696: ...INSTALLATION GUIDE FOR PUNCH UNIT...
Page 716: ...INSTALLATION GUIDE FOR INNER JOB SEPARATOR...
Page 717: ...1 2 3 A B...
Page 718: ...7 8 4 5 6...
Page 719: ...11 9 10...
Page 720: ...A 1 2 3 2 14 15 12 13 16...
Page 721: ...B 3 2 1 2 19 17 18...
Page 722: ...21 22 20...
Page 723: ...26 27 23 24 28 25...
Page 724: ...30 29...
Page 725: ...INSTALLATION GUIDE FOR RIGHT JOB SEPARATOR...
Page 726: ...5 1 2 3 4 5 7 7 6 A B C A B...
Page 727: ...9 10 11 12 13 14 7 8 C...
Page 728: ...INSTALLATION GUIDE FOR FAX System...