2LL/2LJ/2LH
1-2-2
1-2-2 Unpacking and installation
(1) Installation procedure
Unpacking
Removing the tapes
Removing the eject spacer
Installing the paper feeder (option)
Release the lock of the scanner mirror frame
Start
Release of lift plate stopper
Loading paper
Installing the toner containers
Unlocking the developer waste exit
Installing toner
Print out the user setting list
Make test copies
Connect the power cord
Installing other optional devices
Replacing operation panel sheet
Exit maintenance mode
Installing the original platen or DP (option)
Setting the delivery date
(maintenance item U278)
Output an own-status report
(maintenance item U000)
Installing the cassette heater (option)
Completion of the machine installation.
Service Manual Y113350-5
Summary of Contents for d-COPIA 3500MF
Page 1: ...SERVICE MANUAL Copiers d Copia 3500MF 4500MF 5500MF Code Y113350 5...
Page 4: ...This page is intentionally left blank...
Page 10: ...This page is intentionally left blank...
Page 24: ...2LL 2LJ 2LH 1 1 10 This page is intentionally left blank Service Manual Y113350 5...
Page 242: ...2LL 2LJ 2LH 1 3 180 This page is intentionally left blank Service Manual Y113350 5...
Page 330: ...2LL 2LJ 2LH 1 4 88 This page is intentionally left blank Service Manual Y113350 5...
Page 402: ...2LL 2LJ 2LH 1 5 72 This page is intentionally left blank Service Manual Y113350 5...
Page 432: ...2LL 2LJ 2LH 2 1 26 This page is intentionally left blank Service Manual Y113350 5...
Page 439: ...2LL 2LJ 2LH 2 2 7 45 ppm model 55 ppm model only Y113350 5 Sevice Manual...
Page 541: ...1 1 INSTALLATION GUIDE INSTALLATION GUIDE FOR DOCUMENT PROCESSOR...
Page 576: ...INSTALLATION GUIDE FOR PAPER FEEDER...
Page 589: ...INSTALLATION GUIDE FOR LARGE CAPACITY FEEDER...
Page 604: ...INSTALLATION GUIDE FOR SIDE DECK...
Page 628: ...INSTALLATION GUIDE FOR 1000 SHEETS FINISHER...
Page 641: ...INSTALLATION GUIDE FOR 4000 SHEETS FINISHER...
Page 657: ...INSTALLATION GUIDE FOR FINISHER ATTACHMENT KIT...
Page 671: ...INSTALLATION GUIDE FOR CENTER FOLDING UNIT...
Page 688: ...INSTALLATION GUIDE FOR MAILBOX...
Page 696: ...INSTALLATION GUIDE FOR PUNCH UNIT...
Page 716: ...INSTALLATION GUIDE FOR INNER JOB SEPARATOR...
Page 717: ...1 2 3 A B...
Page 718: ...7 8 4 5 6...
Page 719: ...11 9 10...
Page 720: ...A 1 2 3 2 14 15 12 13 16...
Page 721: ...B 3 2 1 2 19 17 18...
Page 722: ...21 22 20...
Page 723: ...26 27 23 24 28 25...
Page 724: ...30 29...
Page 725: ...INSTALLATION GUIDE FOR RIGHT JOB SEPARATOR...
Page 726: ...5 1 2 3 4 5 7 7 6 A B C A B...
Page 727: ...9 10 11 12 13 14 7 8 C...
Page 728: ...INSTALLATION GUIDE FOR FAX System...