9 - 8 9 - 8
MELSEC-Q
9 POSITIONING CONTROL
9.1.3 Designating the positioning address
The following shows the two methods for commanding the position in control using
positioning data.
Absolute system
Positioning control is carried out to a designated position (absolute address) having
the OP as a reference. This address is regarded as the positioning address. (The
start point can be anywhere.)
Address
100
Address
150
Address
300
100
A point
150
B point
300
C point
Within the stroke limit range
Address 150
Address
100
Address 100
Address 150
OP
(Reference point)
Start point
End point
Fig. 9.5 Absolute system positioning control
Incremental system
The position where the machine is currently stopped is regarded as the start point,
and positioning control is carried out for a designated movement amount in a
designated movement direction.
Movement amount
+100
Movement
amount -150
Movement amount
-100
Movement 50
100
150
300
Movement amount-100
A point
B point
Within the stroke limit range
C point
Movement amount
+100
Movement 100
Start point
End point
OP
(Reference point)
Fig. 9.6 Incremental system positioning control
Summary of Contents for GX Configurator-PT
Page 13: ...MEMO SECTION 1...
Page 127: ...7 20 7 20 MELSEC Q 7 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL MEMO...
Page 129: ...MEMO SECTION 2...
Page 221: ...Index 5 Index 5 MEMO...