7 - 5 7 - 5
MELSEC-Q
7 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL
7.3 Creating a program
This section explains "positioning control operation programs" actually used. The
programs designed to perform the functions described in "SECTION 2 CONTROL
DETAILS AND SETTING" are installed in the "positioning control operation programs"
explained in “Section 7.3.2”. (To monitor control, add a necessary monitor program
according to the system. Refer to "Section 4.6 List of monitor data" for monitor items.)
7.3.1 General configuration of program
The general configuration of the "positioning control operation program" is shown
below.
Parameter and
data are...
Set using the
GX Configurator-PT
Set using the
sequence program
Initialization program
Parameter and data
setting program
Start method setting program
Start program
JOG operation program
Sub program
Stop program
Refer to section 7.5.1
Completion of program
creation
Pos
iti
on
ing
c
ontr
o
l ope
ra
ti
on p
rog
ram
Start of program creation
Refer to section 7.5.2
Refer to section 7.5.3
Refer to section 5.7
Refer to section 7.5.4
Summary of Contents for GX Configurator-PT
Page 13: ...MEMO SECTION 1...
Page 127: ...7 20 7 20 MELSEC Q 7 SEQUENCE PROGRAM USED FOR POSITIONING CONTROL MEMO...
Page 129: ...MEMO SECTION 2...
Page 221: ...Index 5 Index 5 MEMO...