[8-13 Parts Replacement Instructions (Outdoor Unit) ]
BS_08_L
chapter 8 -
93
8 Troub
le
sho
o
ting Bas
e
d on Ob
ser
ved
Sy
mp
toms
(22) Re-place the components that were removed as they were. This step completes the check valve block assembly
replacement procedure.
(21) Re-place the LEV4 assembly that was removed in step (11) as it was. (3 areas to be brazed. See Figure 21.)
Figure 21
Rubber spacer
A
A
Area to be brazed
Area to be brazed
Area to be
brazed
Area to be
brazed
45°
LEV4
LEV4
Injection pipe
Injection pipe
Braze with the rubber
spacer attached.
Replace the pipe that
was cut in step (12)
with the pipe included
with the check valve
block assembly.
0000006416.BOOK 93 ページ 2021年10月26日 火曜日 午後5時30分
Summary of Contents for City Multi PURY-EM200YNW-A1
Page 1: ......
Page 11: ...GB_BS_01_L 0000006448 BOOK 2 ページ 2021年10月6日 水曜日 午後1時57分 ...
Page 35: ...GB_BS_02_L 0000006407 BOOK 2 ページ 2021年10月12日 火曜日 午後4時22分 ...
Page 69: ...GB_BS_03_L 0000006412 BOOK 2 ページ 2021年10月12日 火曜日 午後4時33分 ...
Page 97: ...GB_BS_04_L 0000006414 BOOK 2 ページ 2021年10月12日 火曜日 午後4時43分 ...
Page 131: ...GB_BS_05_M 0000006450 BOOK 2 ページ 2021年10月26日 火曜日 午後7時2分 ...
Page 165: ...GB_BS_06_F2 0000006532 BOOK 2 ページ 2021年10月8日 金曜日 午前11時51分 ...
Page 173: ...GB_BS_07_M 0000006452 BOOK 4 ページ 2021年10月27日 水曜日 午前9時38分 ...
Page 267: ...GB_BS_08_L 0000006416 BOOK 4 ページ 2021年10月26日 火曜日 午後5時30分 ...
Page 451: ...GB_BS_09_F 0000006418 BOOK 2 ページ 2021年10月13日 水曜日 午前10時38分 ...
Page 469: ...GB_BS_10_M 0000006456 BOOK 2 ページ 2021年10月26日 火曜日 午後7時49分 ...
Page 502: ......