Expansion valve control (LEV2a, LEV2b, LEV2c, and LEV2d)
The default opening levels of the expansion valves LEV2a, LEV2b, LEV2c, and LEV2d are shown in Section [5-2-8 Outdoor
Unit Fan Control]. When the following control (1) is performed during heating-only or heating-main operation, the valves open
or close.
(1) Evaporation temperature control
LEV is controlled every 30 seconds so that the minimum temperature of the liquid refrigerant (TH12) of the Cooling-main heat
exchanger and of the bypass inlet (TH15) of the HBC are in a constant range during Heating-only or Heating-main operation.
5-2-10
Control of Controller Cooling Function (Electronic Expansion Valve <LEV9>)
Control of controller cooling function is performed individually for OC.
The opening of LEV9 is adjusted every three seconds to keep the controller heatsink temperature (THHS) below the threshold
value, which is determined by the setting of the outside temperature (TH7).
5-2-11
Injection Control (Linear Expansion Valve <LEV4>)
LEV4 opening is adjusted every 30 seconds to keep the discharge temperature (TH4) within the predetermined range.
5-2-12
Control at Initial Startup
When started up for the first time before 12 hours have elapsed after power on, the unit goes into the initial startup mode.
They will go into the normal control mode.
(1) Single-outdoor-unit system
Initial startup mode starts.
Initial startup mode complete
Completed when one of the following three
conditions is met.
50 ≤ F ≤ 60Hz
Completed when the integrated operation time
reaches 35 minutes.
F < 50Hz
Completed when the integrated operation time
reaches 90 minutes.
Completed if the cumulative compressor
operation time exceeds 120 minutes within 5
minutes of startup, and the discharge superheat
(TH4-Tc) of approximately 25 degrees or above is
registered for one continuous minute.
0000006450.BOOK 19 ページ 2021年10月26日 火曜日 午後7時2分
Summary of Contents for City Multi PURY-EM200YNW-A1
Page 1: ......
Page 11: ...GB_BS_01_L 0000006448 BOOK 2 ページ 2021年10月6日 水曜日 午後1時57分 ...
Page 35: ...GB_BS_02_L 0000006407 BOOK 2 ページ 2021年10月12日 火曜日 午後4時22分 ...
Page 69: ...GB_BS_03_L 0000006412 BOOK 2 ページ 2021年10月12日 火曜日 午後4時33分 ...
Page 97: ...GB_BS_04_L 0000006414 BOOK 2 ページ 2021年10月12日 火曜日 午後4時43分 ...
Page 131: ...GB_BS_05_M 0000006450 BOOK 2 ページ 2021年10月26日 火曜日 午後7時2分 ...
Page 165: ...GB_BS_06_F2 0000006532 BOOK 2 ページ 2021年10月8日 金曜日 午前11時51分 ...
Page 173: ...GB_BS_07_M 0000006452 BOOK 4 ページ 2021年10月27日 水曜日 午前9時38分 ...
Page 267: ...GB_BS_08_L 0000006416 BOOK 4 ページ 2021年10月26日 火曜日 午後5時30分 ...
Page 451: ...GB_BS_09_F 0000006418 BOOK 2 ページ 2021年10月13日 水曜日 午前10時38分 ...
Page 469: ...GB_BS_10_M 0000006456 BOOK 2 ページ 2021年10月26日 火曜日 午後7時49分 ...
Page 502: ......