2. Debris removal operation
[When an outdoor unit is connected, and refrigerant piping work, evacuation of refrigerant circuits, and refrigerant charging have
been completed]
1. Turn on DIP SW002-1 if there is a possibility that the debris may have been introduced into the water circuits during piping
work on site.
Use DIP SW002-1 to start the debris removal operation. (Each manual air vent valve must stay open.)
LED position
DIP SW position
Control board (LED, DIP SW positions)
2. Debris removal operation will be completed in 40 minutes, and the LED on the control board will indicate "Air0." The LED indication will
change to "Air1," "Air2," and "AirE" in order. Then, the water pump inside the HBC will stop.
3.
[When no outdoor units are connected, or refrigerant piping work, evacuation of refrigerant circuits, and refrigerant charging have not
been completed (when performing debris removal operation for the water circuits only)]
The following must be completed before performing debris removal operation.
• Assign M-NET addresses to the HBC and the indoor units.
•
•
* While the debris removal operation is being performed, no other functions of the Maintenance Tool are available for use.
1. Follow the procedures below after connecting the MN converter and starting up the Maintenance Tool. (Manuals are accessible from the
Maintenance Tool.)
<Debris removal operation procedure (without connection to an outdoor unit)>
1
2
*
3
After the units are searched for, a sign that indicates the completion of preparation will
appear. Turn on DIP SW002-1 of the Main-HBC to start the operation.
Maintenance Tool window
(Debris removal operation without connection
to an outdoor unit)
2. The LED on the control board will indicate "Air1," "Air2," and "AirE" in order, and the pump will stop after a while.
The progress of the debris removal operation will appear on the service LED of the Main-HBC and on the Maintenance Tool window.
3.
[The rest of the procedures are the same for performing debris removal operation with connection to an outdoor unit (refrigerant piping work,
evacuation of refrigerant circuits, and refrigerant charging have been completed) and without connection to an outdoor unit (refrigerant piping
work, evacuation of refrigerant circuits, and refrigerant charging have not been completed]
002-1.
002-1.
5.43
0000006416.BOOK 129 ページ 2021年10月26日 火曜日 午後5時30分
Summary of Contents for City Multi PURY-EM200YNW-A1
Page 1: ......
Page 11: ...GB_BS_01_L 0000006448 BOOK 2 ページ 2021年10月6日 水曜日 午後1時57分 ...
Page 35: ...GB_BS_02_L 0000006407 BOOK 2 ページ 2021年10月12日 火曜日 午後4時22分 ...
Page 69: ...GB_BS_03_L 0000006412 BOOK 2 ページ 2021年10月12日 火曜日 午後4時33分 ...
Page 97: ...GB_BS_04_L 0000006414 BOOK 2 ページ 2021年10月12日 火曜日 午後4時43分 ...
Page 131: ...GB_BS_05_M 0000006450 BOOK 2 ページ 2021年10月26日 火曜日 午後7時2分 ...
Page 165: ...GB_BS_06_F2 0000006532 BOOK 2 ページ 2021年10月8日 金曜日 午前11時51分 ...
Page 173: ...GB_BS_07_M 0000006452 BOOK 4 ページ 2021年10月27日 水曜日 午前9時38分 ...
Page 267: ...GB_BS_08_L 0000006416 BOOK 4 ページ 2021年10月26日 火曜日 午後5時30分 ...
Page 451: ...GB_BS_09_F 0000006418 BOOK 2 ページ 2021年10月13日 水曜日 午前10時38分 ...
Page 469: ...GB_BS_10_M 0000006456 BOOK 2 ページ 2021年10月26日 火曜日 午後7時49分 ...
Page 502: ......