8-14-3
Instructions for the Air Vent Operation
This operation removes the air from the water circuit after water is supplied to it.
Perform this operation after completion of the following.
*1
• Water piping work
*2
• Air-tightness test of water piping
• Electrical work
• Refrigerant piping work
*3
• Air-tightness test of refrigerant piping
*3
• Evacuation of refrigerant circuits
*3
• Refrigerant charging
*3
*1. Perform air vent operation after completion of water- and refrigerant-piping work,
air-tightness tests, electrical work, evacuation of refrigerant circuits, refrigerant
charging, and debris removal operation (shown on previous pages).
*2.
Install an automatic air vent valve at the highest point of each branch pipe from the HBC (in two places at the highest point of the
return pipe from the Sub-HBC, and in six places at the highest point of the return pipes from indoor units). (See Figure 1.)
Failure to install air vent valves may leave air in the water circuit and damage the pump.
*3. Air vent operation can be performed before completing the refrigerant piping work, air-tightness test of refrigerant piping, evacuation of
refrigerant circuits, and refrigerant charging.
In this case,
perform an air vent operation again after refrigerant piping work, air-tightness test of refrigerant piping, evacuation of
refrigerant circuits, and refrigerant charging have been completed,
because the initial air vent operation may not be able to remove all
dissolved oxygen in the water circuit.
1. Preparation for air vent operation
1. DIP SW settings
[Main-HBC]
Turn on DIP SW001-1. (Water circuit valve setting (valve open when stopped))
2. Turn on the breaker for each unit, and then open the manual air vent valves on the Sub-HBC and the indoor units. (The Main-HBC does not
have an manual air vent valve.)
*
Maintenance-side
Maintenance-side
3. Supply water from the water supply pipe on the HBC.
Water supply pipe
water supply pipe, or remove the water supply hose after the air vent operation.
Connection of water supply pipe
4. Check that water is coming out of the manual air vent valve on each unit, and perform the air vent operation.
Figure 1. Automatic air vent valve
Automatic air vent
valve
Manual air
vent valve
SW001-2.
0000006416.BOOK 131 ページ 2021年10月26日 火曜日 午後5時30分
Summary of Contents for City Multi PURY-EM200YNW-A1
Page 1: ......
Page 11: ...GB_BS_01_L 0000006448 BOOK 2 ページ 2021年10月6日 水曜日 午後1時57分 ...
Page 35: ...GB_BS_02_L 0000006407 BOOK 2 ページ 2021年10月12日 火曜日 午後4時22分 ...
Page 69: ...GB_BS_03_L 0000006412 BOOK 2 ページ 2021年10月12日 火曜日 午後4時33分 ...
Page 97: ...GB_BS_04_L 0000006414 BOOK 2 ページ 2021年10月12日 火曜日 午後4時43分 ...
Page 131: ...GB_BS_05_M 0000006450 BOOK 2 ページ 2021年10月26日 火曜日 午後7時2分 ...
Page 165: ...GB_BS_06_F2 0000006532 BOOK 2 ページ 2021年10月8日 金曜日 午前11時51分 ...
Page 173: ...GB_BS_07_M 0000006452 BOOK 4 ページ 2021年10月27日 水曜日 午前9時38分 ...
Page 267: ...GB_BS_08_L 0000006416 BOOK 4 ページ 2021年10月26日 火曜日 午後5時30分 ...
Page 451: ...GB_BS_09_F 0000006418 BOOK 2 ページ 2021年10月13日 水曜日 午前10時38分 ...
Page 469: ...GB_BS_10_M 0000006456 BOOK 2 ページ 2021年10月26日 火曜日 午後7時49分 ...
Page 502: ......