[8-3 Refrigerant Control Problems ]
BS_08_L
chapter 8 -
13
8 Troub
le
sho
o
ting Bas
e
d on Ob
ser
ved
Sy
mp
toms
Cause
Check method and remedy
2.
HBC LEV1 and 2 actuation failure
Sufficient hot water is not supplied on the HBC due
to HBC LEV1, 2, and 3 actuation failure.
Refer to the following page(s). [8-8-2 General Over-
view on LEV Operation (HBC)]
3.
Temperature reading error on the indoor unit piping
temperature sensor
If the temperature reading on the sensor is higher
than the actual temperature, it makes the subcool
seem smaller than it is, and the LEV opening de-
creases too much.
Check the thermistor.
4.
RPM error of the outdoor unit FAN
Refer to the following page(s).
[8-7 Troubleshooting Outdoor Unit Fan Problems]
[7-3-3 Error Code [1302] (during operation)]
Motor failure or board failure, or airflow rate de-
crease, pressure drop due to clogging of the heat
exchanger leading to high discharge temperature
The fan is not properly controlled as the tempera-
ture cannot be precisely detected with the piping
sensor.
5.
Insulation failure of the refrigerant piping
6.
Long piping length
Excessively long piping on the high pressure side
causes pressure loss leading to increase in the high
pressure.
Confirm that the characteristic of capacity drop due
to piping length.
-> Change the pipe
7.
Piping size is not proper (thin)
8.
Clogging by foreign object
Check the temperature difference between the up-
stream and the downstream of the pipe section that
is blocked. Since blockage in the extended section
is difficult to locate, operate the unit in the cooling
cycle, and follow the same procedures that are
used to locate the blockage of pipe during cooling
operation.
->Remove the blockage in the pipe.
9.
The indoor unit inlet temperature is excessively
high.(exceeding 28°C [82°F])
Check the inlet air temperature and for short cy-
cling. Change the environment where the indoor
unit is used.
10.
Insufficient refrigerant amount
Protection works and compressor frequency does
not rise due to low discharge temperature
Refrigerant recovery operation is likely to start.
Refer to item 1 (Compressor frequency does not
rise sufficiently.) on the previous page.
Refer to the following page(s). [6-3 Evaluating and
Adjusting Refrigerant Charge]
11.
Compressor failure (same as in case of cooling)
Check the discharge temperature.
12.
HBC LEV3 actuation failure
A drop in the low pressure that is caused either by a
blockage of liquid pipe or by a pressure loss and the
resultant slowing of refrigerant flow causes a tenden-
cy for the discharge temperature to rise.
Refer to the following page(s). [8-8-2 General Over-
view on LEV Operation (HBC)]
13.
HBC valve block actuation failure Sufficient hot water
is not supplied because of the insufficient water flow
rate and coexistence of cold and hot water on the
HBC due to valve block actuation failure.
Refer to the following page(s). [8-14 HBC Mainte-
nance Instructions (Applicable to main and sub
HBCs)]
14
Open phase in the power-supply due to improper
power-supply wiring
Make sure that the power-supply wiring is properly
connected. (Refer to item (6) in section [6-1 Read
before Test Run].)
Possible open phase.
15
LEV4 failure
Refer to the following page(s). [8-8-3 Possible
Problems and Solutions]
0000006416.BOOK 13 ページ 2021年10月26日 火曜日 午後5時30分
Summary of Contents for City Multi PURY-EM200YNW-A1
Page 1: ......
Page 11: ...GB_BS_01_L 0000006448 BOOK 2 ページ 2021年10月6日 水曜日 午後1時57分 ...
Page 35: ...GB_BS_02_L 0000006407 BOOK 2 ページ 2021年10月12日 火曜日 午後4時22分 ...
Page 69: ...GB_BS_03_L 0000006412 BOOK 2 ページ 2021年10月12日 火曜日 午後4時33分 ...
Page 97: ...GB_BS_04_L 0000006414 BOOK 2 ページ 2021年10月12日 火曜日 午後4時43分 ...
Page 131: ...GB_BS_05_M 0000006450 BOOK 2 ページ 2021年10月26日 火曜日 午後7時2分 ...
Page 165: ...GB_BS_06_F2 0000006532 BOOK 2 ページ 2021年10月8日 金曜日 午前11時51分 ...
Page 173: ...GB_BS_07_M 0000006452 BOOK 4 ページ 2021年10月27日 水曜日 午前9時38分 ...
Page 267: ...GB_BS_08_L 0000006416 BOOK 4 ページ 2021年10月26日 火曜日 午後5時30分 ...
Page 451: ...GB_BS_09_F 0000006418 BOOK 2 ページ 2021年10月13日 水曜日 午前10時38分 ...
Page 469: ...GB_BS_10_M 0000006456 BOOK 2 ページ 2021年10月26日 火曜日 午後7時49分 ...
Page 502: ......