REPAIR INSTRUCTIONS
Page 247
268
Figure 268 — Oil Pump Installation
After the oil pump has been installed, check the
backlash between the auxiliary shaft gear and the
oil pump driven gear.
3. Check the auxiliary shaft gear to oil pump
driven gear backlash, 0.0072–0.0138 inch
(0.1829–0.3505 mm), using a thickness
gauge between the auxiliary shaft gear and
the oil pump driven gear.
Front Cover Installation
[211 RP]
With the crankshaft, camshaft and auxiliary shaft
in place, install the front cover.
1. Apply a light coat of Silastic
®
to the timing
cover mounting surface.
2. Position the timing cover on the cylinder
block mounting surface.
3. Secure the timing cover to the cylinder block
using the mounting capscrews. Torque the
capscrews to 40 lb-ft (54 N•m), using torque
wrench J 24407, or equivalent.
4. Position the front pedestal mount on the
timing cover and secure with the mounting
hardware. Torque the pedestal mounting
capscrews to 70 lb-ft (95 N•m), using torque
wrench J 24407, or equivalent.
1. Lubrication Oil Pump
2. Mounting Capscrews
3. Cylinder Block
5_106_00.bk Page 247 Friday, August 4, 2000 11:17 AM
BDC for engine manuals and specs