Step 6. If you are installing an IBM MAX5 for the first time, locate the power sharing connector on the
BladeCenter HX5 blade server and remove the power jumper if one is installed (see “Blade server
connectors - BladeCenter HX5” on page 12).
Step 7. If you are installing the IBM MAX5 expansion blade option for the first time on an BladeCenter HX5
with tall heat sinks, complete the following steps:
1. Remove the operator control panel access panel:
a. Using a screwdriver, remove each of the screws on the right access panel.
b. Lift the access panel away from the blade server.
2. Remove the embedded hypervisor card access panel:
a. Using a screwdriver, remove each of the screws on the right access panel.
b. Lift the access panel away from the blade server.
3. Install the EMC gasket on the upper ridge of the BladeCenter HX5 blade server bezel.
4. Install the operator control panel access panel:
90
BladeCenter HX5 Blade ServerProblem Determination and Service Guide
Summary of Contents for BladeCenter HX5 1909
Page 6: ...iv BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Page 16: ......
Page 34: ...18 BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Page 72: ...56 BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Page 292: ...276 BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Page 296: ...280 BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Page 303: ...Taiwan Class A compliance statement Appendix B Notices 287 ...
Page 304: ...288 BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Page 310: ...294 BladeCenter HX5 Blade ServerProblem Determination and Service Guide ...
Page 311: ......
Page 312: ...Part Number 46W8208 Printed in China 1P P N 46W8208 ...
Page 313: ... 1P46W8208 ...