66
7)
Rotate the instrument to make the “dHR” as about 0°,
then lock the horizontal motion screw and use
horizontal tangent screw to make the “dHR” as
“0°00′00″”. Finally, press[F1] (Meas);
HR:
dHR:
T.H
Mode
Meas
Next P
HD:
m
dHD:
m
dZ:
252°23′52″
0°00′00″
[Sngl]<<
m
HR:
dHR:
T.H
Mode
Meas
Next P
dN:
m
dE:
m
dZ:
252°23′52″
0°00′00″
[Sngl]<<
m
[Dist] [Coord.]
HD: Measured distance
dHD: Distance difference when aiming at stake-out point
dN: measured coordinate(N)- coordinate (N) stake-out
dE: measured coordinate(E)- coordinate (E) stake-out
dZ: measured coordinate(Z)- coordinate (Z) stake-out
8)
When the values of “dHR”, “dHD” and “dZ”(dN, dE,
dZ) are zero, the staking out is completed;
HR:
dHR:
T.H
Mode
Meas
Next P
HD:
m
dHD:
m
dZ:
252°23′52″
0°00′00″
3.473
0.000
0.000
m
HR:
dHR:
T.H
Mode
Meas
Next P
dN:
m
dE:
m
dZ:
252°23′52″
0°00′00″
0.000
0.000
0.000
m
[Dist] [Coord.]
9)
Press [F4] (Next P) to enter the next point stake-out.
Then, the last stake-out point will be displayed. If the
last point name is number, then the next point name
will be added 1.