HCEN12745 Revision 10.2016
Program version 2.xx
AK 98 Dialysis Machine - Attentions
B:133
559 Heparin pump is overloaded
559 Heparin pump is overloaded
Check heparin line for obstruction.
Appears:
When the pressure in the syringe is too high during priming.
Machine actions:
The heparin pump stops.
Operator action:
Check the syringe. Check for kinks on the thin line
connected to the syringe. See Section 4.2.6
on page A:89 in Operators handbook.
Mute time:
2 minutes.
Summary of Contents for AK 98
Page 1: ...AK 98 Dialysis Machine Operator s Manual Program version 2 xx Order number MHCEN12745 10 16 ...
Page 45: ...This page is intentionally left blank This page is intentionally left blank ...
Page 106: ...This page is intentionally left blank This page is intentionally left blank ...
Page 118: ...This page is intentionally left blank This page is intentionally left blank ...
Page 128: ...This page is intentionally left blank This page is intentionally left blank ...
Page 144: ...This page is intentionally left blank This page is intentionally left blank ...
Page 166: ...This page is intentionally left blank This page is intentionally left blank ...
Page 196: ...This page is intentionally left blank This page is intentionally left blank ...
Page 198: ...This page is intentionally left blank This page is intentionally left blank ...
Page 208: ...This page is intentionally left blank This page is intentionally left blank ...
Page 268: ...This page is intentionally left blank This page is intentionally left blank ...