62
AIR CONDITIONING
62- 10
DISMOUNTING
Disconnect the battery.
Drain the air condiotioning unit to the station
by recovering the refrigerant fluid
Dismount it from screws (
6
) and release the
cold air-blowing device (
2
) from the climate con-
trol box (see D.S.A.F. dismounting-remounting)
Disconnect and release the two attachment
screws (
3
) of the air blower.
Dismount the resistance’s assembly (
7)
Supply the gear motor in order to bring the
recycling control flap in vertical position.
Dismount the attachment screw (
1
) of the air
filter protection cap
(9
) and release the filter (
8
).
Dismount the attachment screws
(4
) of the
D.S.A.F. cases and release the evaporator (
5).
REMOUNTING
Perform the dismounting operations in the
reverse order.
Vacuum then charge the air conditioning
circuit with refrigerant fluid
HFc 134a
by
means of the charging station.
Check the good operation of the air
conditioning system.
NOTÃ:
Garniturile autoadezive ale D.S.A.F.
vor fi înlocuite cu altele noi.
Evaporator
3
4
5
6
2
1
9
8
7
vnx.su
Summary of Contents for Solenza 2004
Page 45: ...ENGINE E7J 262 10 ENGINE ASSEMBLY 10 20 CYLINDERHEAD Dismounting Remounting vnx su...
Page 51: ...ENGINE E7J 262 10 ENGINE ASSEMBLY 10 26 CYLINDERSBLOCK Dismounting Remounting vnx su...
Page 60: ...ENGINE E7J 262 10 ENGINE ASSEMBLY 10 35 DISTRIBUTION Dismounting Remounting vnx su...
Page 201: ...19 19 14 COOLING EXHAUST TANK Assembl exhaust vnx su...
Page 212: ...19 19 25 COOLING EXHAUST TANK Engine suspension TIGHTENINGMOMENTS daNm vnx su...
Page 221: ...CV JH3 051 21 MECHANICAL GEARBOX 21 1 Sectional view vnx su...
Page 272: ...GENERAL 30 3 30 Tightening moments in daNm FRONTHALF AXLE Front axle 10 5 6 2 2 7 2 7 vnx su...
Page 273: ...GENERAL 30 4 30 Tightening moments daNm REARAXLE Rear axle 8 5 3 5 7 5 12 22 vnx su...
Page 274: ...GENERAL 30 5 30 Tightening moments daNm REARAXLE Rear axle 7 5 2 12 1 45 vnx su...
Page 318: ...33 REAR AXLES ELEMENTS 33 4 Rear suspension LONGITUDINALSECTION vnx su...
Page 378: ...40 GENERAL 40 4 1 3 2 4 Openings clearance vnx su...
Page 379: ...40 GENERAL 40 5 9 7 6 5 10 12 11 8 Openings clearance vnx su...
Page 380: ...40 GENERAL 40 6 Openings clearance 19 16a 18 17 16c 21 16d 13 14 vnx su...
Page 381: ...40 GENERAL 40 7 Openings clearance 25 23 24 22 vnx su...
Page 382: ...40 GENERAL 40 8 26 32 36 31 35 26a 33 Openings clearance vnx su...
Page 478: ...62 AIR CONDITIONING 62 4 Air conditioning unit operating diagram vnx su...
Page 607: ...83 INSTRUMENT PANEL 83 1 Instrument panel without RPM meter vnx su...
Page 608: ...INSTRUMENT PANEL 83 83 2 Instrument panel with RPM meter vnx su...
Page 708: ...89 ELECTRIC DIAGRAMS 89 12 Electric components location on the vehicle vnx su...
Page 709: ...89 ELECTRIC DIAGRAMS 89 13 FUNCTIONAL ELECTRICDIAGRAMS Functional electric diagrams vnx su...
Page 719: ...89 ELECTRIC DIAGRAMS 89 23 Wires functions in connectors and couplings vnx su...
Page 721: ...89 ELECTRIC DIAGRAMS 89 25 Wires functions in connectors and couplings vnx su...
Page 805: ...89 ELECTRIC DIAGRAMS 89 12 Electric components location on the vehicle vnx su...
Page 806: ...89 ELECTRIC DIAGRAMS 89 13 FUNCTIONAL ELECTRICDIAGRAMS Functional electric diagrams vnx su...
Page 816: ...89 ELECTRIC DIAGRAMS 89 23 Wires functions in connectors and couplings vnx su...
Page 818: ...89 ELECTRIC DIAGRAMS 89 25 Wires functions in connectors and couplings vnx su...