IGNITION AND INJECTION
17
17 - 29
AFTER
REPARATION
Perform the operations from “recommendations” for reparation confirmation.
Fix any other possible failures.
Erase the failures memorized by the injection computer.
Perform a conformity checking by means of the CLIP tester.
Check the connection and the state of the detonation sensor connector.
Replace the sensor’s connector if necessary.
Check the tightening of the RPM sensor on the engine block
Fix if necessary.
Connect the 90 ways terminal box instead of the injection computer then check the
insulation,
continuity and absence of the parasite resistance on lines:
Pin 20 injection computer > p
in 1 detonation sensor
Pin 79 injection computer > p
in 2 detonation sensor
Pin 19 injection computer >
RPM sensor screening
Fix if necessary
If the problem is persisting after these checking, fix the other failures then perform the conformity
checking.
RECOMMENDATIONS
Conditions for diagnostic application for memorized failure:
Perform a road test with warm and in charge engine.
* If the failure is memorized with OBD indicator on, check in the context part,
if state “ET289 : Detonation sensor circuit” corresponding to the OBD
indicator lighting request is affirmative. In this case, proceed as per bellow
mentioned method.
Diagnostic – Failures interpretation
DF006
PRESENT
OR
MEMORIZED
DETONATION SENSOR CIRCUIT
1. DEF : Open circuit or short-circuit
vnx.su
Summary of Contents for Solenza 2004
Page 45: ...ENGINE E7J 262 10 ENGINE ASSEMBLY 10 20 CYLINDERHEAD Dismounting Remounting vnx su...
Page 51: ...ENGINE E7J 262 10 ENGINE ASSEMBLY 10 26 CYLINDERSBLOCK Dismounting Remounting vnx su...
Page 60: ...ENGINE E7J 262 10 ENGINE ASSEMBLY 10 35 DISTRIBUTION Dismounting Remounting vnx su...
Page 201: ...19 19 14 COOLING EXHAUST TANK Assembl exhaust vnx su...
Page 212: ...19 19 25 COOLING EXHAUST TANK Engine suspension TIGHTENINGMOMENTS daNm vnx su...
Page 221: ...CV JH3 051 21 MECHANICAL GEARBOX 21 1 Sectional view vnx su...
Page 272: ...GENERAL 30 3 30 Tightening moments in daNm FRONTHALF AXLE Front axle 10 5 6 2 2 7 2 7 vnx su...
Page 273: ...GENERAL 30 4 30 Tightening moments daNm REARAXLE Rear axle 8 5 3 5 7 5 12 22 vnx su...
Page 274: ...GENERAL 30 5 30 Tightening moments daNm REARAXLE Rear axle 7 5 2 12 1 45 vnx su...
Page 318: ...33 REAR AXLES ELEMENTS 33 4 Rear suspension LONGITUDINALSECTION vnx su...
Page 378: ...40 GENERAL 40 4 1 3 2 4 Openings clearance vnx su...
Page 379: ...40 GENERAL 40 5 9 7 6 5 10 12 11 8 Openings clearance vnx su...
Page 380: ...40 GENERAL 40 6 Openings clearance 19 16a 18 17 16c 21 16d 13 14 vnx su...
Page 381: ...40 GENERAL 40 7 Openings clearance 25 23 24 22 vnx su...
Page 382: ...40 GENERAL 40 8 26 32 36 31 35 26a 33 Openings clearance vnx su...
Page 478: ...62 AIR CONDITIONING 62 4 Air conditioning unit operating diagram vnx su...
Page 607: ...83 INSTRUMENT PANEL 83 1 Instrument panel without RPM meter vnx su...
Page 608: ...INSTRUMENT PANEL 83 83 2 Instrument panel with RPM meter vnx su...
Page 708: ...89 ELECTRIC DIAGRAMS 89 12 Electric components location on the vehicle vnx su...
Page 709: ...89 ELECTRIC DIAGRAMS 89 13 FUNCTIONAL ELECTRICDIAGRAMS Functional electric diagrams vnx su...
Page 719: ...89 ELECTRIC DIAGRAMS 89 23 Wires functions in connectors and couplings vnx su...
Page 721: ...89 ELECTRIC DIAGRAMS 89 25 Wires functions in connectors and couplings vnx su...
Page 805: ...89 ELECTRIC DIAGRAMS 89 12 Electric components location on the vehicle vnx su...
Page 806: ...89 ELECTRIC DIAGRAMS 89 13 FUNCTIONAL ELECTRICDIAGRAMS Functional electric diagrams vnx su...
Page 816: ...89 ELECTRIC DIAGRAMS 89 23 Wires functions in connectors and couplings vnx su...
Page 818: ...89 ELECTRIC DIAGRAMS 89 25 Wires functions in connectors and couplings vnx su...