
Time delays less than 10 cycles can be entered to the nearest 0.1 cycles through the HMI. All time
delays can be entered to the nearest 0.01 cycles from the ASCII command interface. Time delays entered
in cycles are converted to milliseconds or seconds. Increment precision after conversion is limited to that
appropriate for each of those units of measure.
Example 1.
Make the following operating settings to the 62 element. Figure 4-60 illustrates these
settings.
Time units:
ms
T1 Time:
100
T2 Time:
0
Retrieving General Purpose Logic Timers Status from the Relay
The status of each logic variable can be determined from the ASCII command interface by using the RG-
STAT (report general-status) or the RL (report logic) commands. Status can also be determined using
BESTCOMS
Metering
screen. See Section 6,
Reporting and Alarm Functions, General Status Reporting
,
for more information.
VOLTAGE TRANSFORMER FUSE LOSS DETECTION
60FL - Fuse Loss Detection
BE1-CDS240 relays have one 60FL element that can be used to detect fuse loss or loss of potential in a
three-phase system. The 60FL element is illustrated in Figure 4-61. When the element logic becomes
TRUE, the 60FL logic output becomes TRUE. A logic diagram is shown in Figure 4-62. Logic parameters
are shown in Table 4-34.
D2861-01
07-13-00
VT FUSE
LOSS
(60FL)
60FL
Figure 4-61. Fuse Loss Detection Logic Block
Trip Logic:
60FL Trip = (A * B * C * D * G) + (E * F * B * G) (See Table 4-42.)
Reset Logic:
60FL Reset = H * /K */L (See Table 4-42.)
4-64
BE1-CDS240 Protection and Control
9365200990 Rev F
Summary of Contents for BE1-CDS240
Page 2: ......
Page 8: ...vi BE1 CDS240 Introduction 9365200990 Rev F This page intentionally left blank ...
Page 38: ...1 28 BE1 CDS240 General Information 9365200990 Rev F This page intentionally left blank ...
Page 40: ...ii BE1 CDS240 Quick Start 9365200990 Rev F This page intentionally left blank ...
Page 152: ...ii BE1 CDS240 Metering 9365200990 Rev F This page intentionally left blank ...
Page 226: ...iv BE1 CDS240 Application 9365200990 Rev F This page intentionally left blank ...
Page 286: ...ii BE1 CDS240 Security 9365200990 Rev F This page intentionally left blank ...
Page 290: ...9 4 BE1 CDS240 Security 9365200990 Rev F This page intentionally left blank ...
Page 292: ...ii BE1 CDS240 Human Machine Interface 9365200990 Rev F This page intentionally left blank ...
Page 306: ...10 14 BE1 CDS240 Human Machine Interface 9365200990 Rev F This page intentionally left blank ...
Page 308: ...ii BE1 CDS240 ASCII Command Interface 9365200990 Rev F This page intentionally left blank ...
Page 342: ...11 34 BE1 CDS240 ASCII Command Interface 9365200990 Rev F This page intentionally left blank ...
Page 349: ...Figure 12 5 Horizontal Rack Mount Front View 9365200990 Rev F BE1 CDS240 Installation 12 5 ...
Page 361: ...Figure 12 17 Typical DC Connection Diagrams 9365200990 Rev F BE1 CDS240 Installation 12 17 ...
Page 372: ...12 28 BE1 CDS240 Installation 9365200990 Rev F This page intentionally left blank ...
Page 468: ...13 92 BE1 CDS240 Testing and Maintenance 9365200990 Rev F This page intentionally left blank ...
Page 512: ...14 42 BE1 CDS240 BESTCOMS Software 9365200990 Rev F This page intentionally left blank ...
Page 544: ...ii BE1 CDS240 Terminal Communication 9365200990 Rev F This page intentionally left blank ...
Page 550: ...ii BE1 CDS240 Settings Calculations 9365200990 Rev F This page intentionally left blank ...
Page 578: ...D 28 BE1 CDS240 Settings Calculations 9365200990 Rev F This page intentionally left blank ...
Page 579: ......