M470039-01 REV-F
Page 44
TWO: INSTALLATION
INTRODUCTION
This section provides recommenda tions a nd procedures for inspecting, insta lling, a nd testing the electronic loa d.
BASIC SETUP PROCEDURE
Use Ta ble 2.1 to summa rize the ba sic setup procedure a nd a n overa ll v iew of the subsections. Use the procedure a s a
quick reference if you a re fa milia r with the insta lla tion requirements for the progra mming electronic loa d. If you wa nt
more informa tion, ea ch step in the procedure refers to subsequent sections, which conta in more deta ils. Execute ea ch step
in the sequence provided.
----------------------------------------------------------------------------------------------------------------------------- ---------
Step# Description Action
Reference
----------------------------------------------------------------------------------------------------------------------------- ---------
1
Inspection Perform a n initia l physica l
Inspection, clea ning,
inspection of the loa d.
a nd pa cka ging.
--------------------------------------------------------------------------------------------------------------------------------------
2 Insta lla tion Insta ll the instrument on
Loca tion, mounting,
bench or ra ck mount,
a nd ventila tion.
ensuring a dequate ventila tion.
--------------------------------------------------------------------------------------------------------------------------------------
3 Input power Connect AC input power
AC input power
connection.
----------------------------------------------------------------------------------------------------------------------------- ---------
4 Test Perform functiona l tests fo r
Functiona l test.
CV mode, CC mode, a nd
front pa nel controls.
----------------------------------------------------------------------------------------------------------------------------- ---------
5 Source Connect the source.
Source connection.
----------------------------------------------------------------------------------------------------------------------------- ---------
6 Sense Connect sensing lines.
Loca l a nd Remote sense.
TABLE 2.1 BASIC SETUP PROCEDUE
INSPECTION, CLEANING, AND PACKAGING
•
INITIAL INSPECTION: When you first receive your unit, perform a quick physica l check.
1.
Inspect the instrument for cra cks, scra tches, broken switches, connectors, a nd displa y.
2.
Make sure there is not dama ge on the AC power cord; the AC input cover is insta lled properly a nd with the
stra in relief.
3.
Ma ke sure there is no loose component in the unit tha t ma y ca use by the long dista nce shipping.
If the unit is da ma ged, sa ve a ll the pa cking ma teria ls a nd notify the ca rrier immedia tely.
•
MAINTENANCE: No routine serv icin g of the electronic loa d is required except for periodic clea ning.
Whenever the instrument is removed from opera tion, first use a low pressure a ir to b low dust from in a nd a round
components on the printed circu it boa rd, clea n the front panel with dry c loth or with a wea k solution of soap a nd
Summary of Contents for Amrel PLA 2U
Page 2: ......
Page 4: ...M470039 01 REV F Page 3 This is page intentionally left blank...
Page 6: ...M470039 01 REV F Page 5 This page intentionally left blank...
Page 8: ...M470039 01 REV F Page 7 This page intentionally left blank...
Page 132: ...M470039 01 REV F Page 131 SEVEN SPECIFICATIONAND POWER CURVE COMMON SPECIFICATIONS...
Page 141: ...M470039 01 REV F Page 140...
Page 161: ......
Page 162: ......