APPENDIX C: PV SWEEP - PC Software Guide
Start Program
When click on the icon, an interface selection window is pop-up to select communication interface between
PC and device. Please turn the knob to select interface, and change the interface parameters, and click the
button to launch interface communication.
If interface successfully connect to eLoad device, control panel will pop-up for operation.
Access Control Panel
When interface successfully connect to device, a control panel will be displayed on the windows desktop.
Note:
For Solar PV testing, please use PV Mode
Sweep Operation & Data Capture
To start sweep operation, select sweep mode on
control, input sweep test case by entering
specified values in
Start (Voltage)
,
Stop (Voltage)
,
Step (1mV ~ Vmax range)
, and
Time (100ms ~ 60s
range)
control fields. The Step and Time parameters will configure the voltage increment and sampling time at
PV SWEEP & PV OPERATION GUIDE
Revision History
First release 1.0
Summary of Contents for Amrel PLA 2U
Page 2: ......
Page 4: ...M470039 01 REV F Page 3 This is page intentionally left blank...
Page 6: ...M470039 01 REV F Page 5 This page intentionally left blank...
Page 8: ...M470039 01 REV F Page 7 This page intentionally left blank...
Page 132: ...M470039 01 REV F Page 131 SEVEN SPECIFICATIONAND POWER CURVE COMMON SPECIFICATIONS...
Page 141: ...M470039 01 REV F Page 140...
Page 161: ......
Page 162: ......