2/2
B 20
Positioning the pump
in the pumping installation
G 01050 - Edition 06 - December 06
Unscrew without removing it the front cover fixing screw (1) and rotate
the cover around its axes (2). Remove the front cover by pulling it
outwards (3).
Turn the quarter turn lotches (4) using a screwdriver and pull the
lateral cover.
Pull (5) top part of the cover to remove the side cover out; then lift.
Repeat the operation for the other side cover.
Remove pump covers
Remove the flanging
components
(ADS 602 version)
1
2
3
5
4
4
Remove the two assembling
screws from the flanging plate,
and the claw clamps (using
a17 mm flat wrench).
Unscrew the screws maintaining
the plate on the clamping bar.
Remove the hoisting rings and
disassemble the clamping bar.
Re-install the hoisting rings to lift
the pump.
Note: Keep the flanging components in order to dispatch the pump, if
required.
17
13
Front cover
Side cover
Make sure the circuit is electrically isolated
adixen Vacuum Products - Operating instructions - ADP/ADS Series Two