2470 High Voltage SourceMeter Instrument Reference Manual
Section 13: Introduction to TSP commands
2470-901-01 Rev. A /
May
2019
13-39
The TSP files for the selected project are added to the Available Project Files list on the Main tab.
Figure 148: Available files for selected project
8.
Select the files you want to add to the run configuration and click
Add
to add them to the Load
Order list.
To change the load order of the TSP files, select the files you want to move and click
Up
or
Down
until the files are in the correct order.
Figure 149: Selected TSP files load order