
Frequency inverters with Control Units CU230P-2 HVAC, CU230P-2 DP, CU230P-2 CAN
Operating Instructions, 01/2011, FW 4.4, A5E02430659B AD
53
Commissioning
4
You must commission the inverter after installation has been completed.
To do this, using Section "Preparing for commissioning (Page 56)" you must clarify whether
the motor can be operated with the inverter factory settings or an additional adaptation of the
inverter is required. The two commissioning options are shown in the following diagram.
%DVLFFRPPLVVLR
QLQJ
&RPPLVVLRQLQJZLWK
IDFWRU\VHWWLQJV
)LHOGEXV
FRQILJXULQJ
6HWWLQJIXQFWLRQV
$GDSWLQJWKH
WHUPLQDOVWULS
,QWHUIDFHV
IRUFRQWURO"
&RPPLVVLRQLQJ
FRPSOHWHG
&RPPLVVLRQLQJ
FRPSOHWHG
&RPPLVVLRQLQJZLWK
IDFWRU\VHWWLQJV
&RPPLVVLRQLQJZLWK
DSSOLFDWLRQVSHFLILF
DGDSWDWLRQV
)LHOGEXV
7HUPLQDOV
)LHOGEXV
FRQILJXULQJ
,QWHUIDFHV
IRUFRQWURO"
)LHOGEXV
7HUPLQDOV
$GGLWLRQDOLQSXW
RXWSXWVLJQDOVYLD
WHUPLQDOV"
1R
<HV
$GGLWLRQDO
IXQFWLRQV"
1R
<HV
①
Commissioning with factory settings (Page 60)
④
Configuring the fieldbus (Page 97)
②
Set basic commissioning with STARTER (Page 68) or BOP-2 (Page 63)
⑤
③
Adapting the terminal strip (Page 85)
Figure 4-1
Commissioning procedure
Содержание SINAMICS G120 CU230P-2
Страница 2: ......