If the impaired node is
displaying…
Then…
System prompt or password
prompt (enter system password)
Take over or halt the impaired node:
• For an HA pair, take over the impaired node from the healthy
node:
storage failover takeover -ofnode
impaired_node_name
When the impaired node shows Waiting for giveback…, press
Ctrl-C, and then respond
y
.
Option 3: Controller is in a two-node MetroCluster
To shut down the impaired node, you must determine the status of the node and, if
necessary, switch over the node so that the healthy node continues to serve data from
the impaired node storage.
About this task
• If you are using NetApp Storage Encryption, you must have reset the MSID using the instructions in the
"Returning SEDs to unprotected mode" section of
Administration overview with the CLI
• You must leave the power supplies turned on at the end of this procedure to provide power to the healthy
node.
Steps
1. Check the MetroCluster status to determine whether the impaired node has automatically switched over to
the healthy node:
metrocluster show
2. Depending on whether an automatic switchover has occurred, proceed according to the following table:
If the impaired node…
Then…
Has automatically switched over
Proceed to the next step.
Has not automatically switched
over
Perform a planned switchover operation from the healthy node:
metrocluster switchover
Has not automatically switched
over, you attempted switchover
with the
metrocluster
switchover
command, and the
switchover was vetoed
Review the veto messages and, if possible, resolve the issue and try
again. If you are unable to resolve the issue, contact technical
support.
3. Resynchronize the data aggregates by running the
metrocluster heal -phase aggregates
command from the surviving cluster.
570
Содержание AFF A700
Страница 4: ...AFF and FAS System Documentation 1...
Страница 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Страница 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Страница 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Страница 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Страница 437: ...1 Locate the DIMMs on your controller module 434...
Страница 601: ...Cabling SAS shelves in FAS9000 AFF A700 and ASA AFF A700 ONTAP 9 8 and later Cabling SAS storage ONTAP 9 8 and later 598...
Страница 605: ...602...
Страница 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Страница 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Страница 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Страница 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Страница 1462: ...Installing SuperRail to round hole four post rack 1459...
Страница 1602: ...1599...
Страница 1630: ...1627...
Страница 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Страница 1637: ...b Raise the drive handle to vertical c Use the handle to lift the drive from the drive drawer 1634...
Страница 1643: ...Callout Cable chain Connector Connects to Left Vertical Midplane Left Horizontal Drive drawer 1640...
Страница 1645: ...Guide rail 1642...
Страница 1648: ...Tab that you press to release the fan module handle 5 Use the fan module handle to pull the fan module out of the shelf 1645...
Страница 1669: ...Attention LED light on 1666...