• You must have completed the applicable preparation procedures.
• You must have installed the shelves, powered them on, and set the shelf IDs.
Install a drive shelf for a hot-add
Steps
1. If you are hot-adding one shelf using one set of RoCE capable ports (one RoCE capable PCIe card) on
each controller module, and this is the only NS224 shelf in your HA pair, complete the following substeps.
Otherwise, go to the next step.
This step assumes you installed the RoCE capable PCIe card in slot 5.
a. Cable shelf NSM A port e0a to controller A slot 5 port a.
b. Cable shelf NSM A port e0b to controller B slot 5 port b.
c. Cable shelf NSM B port e0a to controller B slot 5 port a.
d. Cable shelf NSM B port e0b to controller A slot 5 port b.
The following illustration shows cabling for one hot-added shelf using one RoCE capable PCIe card on
each controller module:
1505
Содержание AFF A700
Страница 4: ...AFF and FAS System Documentation 1...
Страница 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Страница 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Страница 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Страница 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Страница 437: ...1 Locate the DIMMs on your controller module 434...
Страница 601: ...Cabling SAS shelves in FAS9000 AFF A700 and ASA AFF A700 ONTAP 9 8 and later Cabling SAS storage ONTAP 9 8 and later 598...
Страница 605: ...602...
Страница 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Страница 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Страница 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Страница 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Страница 1462: ...Installing SuperRail to round hole four post rack 1459...
Страница 1602: ...1599...
Страница 1630: ...1627...
Страница 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Страница 1637: ...b Raise the drive handle to vertical c Use the handle to lift the drive from the drive drawer 1634...
Страница 1643: ...Callout Cable chain Connector Connects to Left Vertical Midplane Left Horizontal Drive drawer 1640...
Страница 1645: ...Guide rail 1642...
Страница 1648: ...Tab that you press to release the fan module handle 5 Use the fan module handle to pull the fan module out of the shelf 1645...
Страница 1669: ...Attention LED light on 1666...