Before you begin
• The shelf’s partner NSM module must be up and running, and be cabled correctly so that your shelf
maintains connectivity when you remove the NSM module with the failed FRU (target NSM module).
NetApp Downloads: Config Advisor
• All other components in the system must be functioning properly.
About this task
• Allow at least 70 seconds between removal and installation of the NVMe shelf module (NSM).
This allows enough time for ONTAP to process the NSM removal event.
•
Best practice:
The best practice is to have current versions of NVMe shelf module (NSM) firmware and
drive firmware on your system before replacing FRU components.
Do not revert firmware to a version that does not support your shelf and its components.
NetApp Downloads: Disk Shelf Firmware
NetApp Downloads: Disk Drive Firmware
• If needed, you can turn on the shelf’s location (blue) LEDs to aid in physically locating the affected shelf:
storage shelf location-led modify -shelf-name
shelf_name
-led-status on
If you do not know the
shelf_name
of the affected shelf, run the
storage shelf show
command.
A shelf has three location LEDs: one on the operator display panel and one on each NSM module.
Location LEDs remain illuminated for 30 minutes. You can turn them off by entering the same command,
but using the
off
option.
• When you unpack the replacement RTC battery, save all packing materials for use when you return the
failed RTC battery.
If you need the RMA number or additional help with the replacement procedure, contact technical support
at
, 888-463-8277 (North America), 00-800-44-638277 (Europe), or +800-800-80-800
(Asia/Pacific).
• You can use the following video or the written steps to replace an RTC battery.
Replacing an RTC battery in an NS224 drive shelf
Steps
1. Properly ground yourself.
2. Disconnect the cabling from the NSM module that contains the FRU that you are replacing:
a. Disconnect the power cord from the power supply by opening the power cord retainer, and then unplug
the power cord from the power supply.
Power supplies do not have a power switch.
b. Disconnect the storage cabling from the NSM module ports.
Make a note of the NSM module ports that each cable is connected to. You reconnect the cables to the
1536
Содержание AFF A700
Страница 4: ...AFF and FAS System Documentation 1...
Страница 208: ...3 Close the controller module cover and tighten the thumbscrew 205...
Страница 248: ...2 Close the controller module cover and tighten the thumbscrew 245...
Страница 308: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 305...
Страница 381: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 378...
Страница 437: ...1 Locate the DIMMs on your controller module 434...
Страница 601: ...Cabling SAS shelves in FAS9000 AFF A700 and ASA AFF A700 ONTAP 9 8 and later Cabling SAS storage ONTAP 9 8 and later 598...
Страница 605: ...602...
Страница 1117: ...3 Close the controller module cover and tighten the thumbscrew 1114...
Страница 1157: ...2 Close the controller module cover and tighten the thumbscrew 1154...
Страница 1228: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1225...
Страница 1300: ...Power supply Cam handle release latch Power and Fault LEDs Cam handle 1297...
Страница 1462: ...Installing SuperRail to round hole four post rack 1459...
Страница 1602: ...1599...
Страница 1630: ...1627...
Страница 1634: ...Orange ring on horizontal bracket Cable chain 1631...
Страница 1637: ...b Raise the drive handle to vertical c Use the handle to lift the drive from the drive drawer 1634...
Страница 1643: ...Callout Cable chain Connector Connects to Left Vertical Midplane Left Horizontal Drive drawer 1640...
Страница 1645: ...Guide rail 1642...
Страница 1648: ...Tab that you press to release the fan module handle 5 Use the fan module handle to pull the fan module out of the shelf 1645...
Страница 1669: ...Attention LED light on 1666...