8 - 18 8 - 18
MELSEC
8 OPERATING THE UTILITY SOFTWARE
(d) Network test
This is used to test the start or stop of the data link after connecting CC-
Link cables or after establishing the data link.
POINT
(1) When the data link of the master station is stopped, the data link of the entire
CC-Link system is stopped.
(2) The Network test is executable only when the Data link status of the CC-Link
Ver.2 board is "In data link", "Suspend data link" or "During Auto-Returning."
[Operation Procedure]
After selecting "Network test" in the Test item, click the [Start] button. The
Network test screen appears.
1)
2)
3)
4)
Item Description
1) Start data link
Starts the data link.
2) Stop data link
Stops the data link.
3) OK button
Starts the test.
4) Cancel button
Cancels the test.
8.3 Device Monitor Utility
For the operation and setting method for the device monitor utility, refer to "MELSEC
Data Link Library Reference Manual".
Содержание Q80BD-J61BT11N
Страница 2: ......
Страница 34: ...1 10 1 10 MELSEC 1 OVERVIEW MEMO ...
Страница 54: ...3 12 3 12 MELSEC 3 SPECIFICATIONS MEMO ...
Страница 124: ...5 16 5 16 MELSEC 5 PROCEDURE BEFORE STARTING THE DATA LINK MEMO ...
Страница 160: ...9 2 9 2 MELSEC 9 MELSEC DATA LINK LIBRARY MEMO 9 ...
Страница 200: ...12 16 12 16 MELSEC 12 COMMUNICATION BETWEEN THE MASTER STATION AND LOCAL STATIONS MEMO ...
Страница 212: ...13 12 13 12 MELSEC 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATION AJ65BT R2 MEMO ...
Страница 228: ...14 16 14 16 MELSEC 14 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATION AJ65BT D75P2 S3 MEMO ...
Страница 354: ...App 92 App 92 MELSEC APPENDIX Appendix 19 2 Q81BD J61BT11 121 141 147 153 19 158 103 5 91 Unit mm ...
Страница 355: ...App 93 App 93 MELSEC APPENDIX MEMO ...
Страница 361: ......