14 - 13 14 - 13
MELSEC
14 COMMUNICATION BETWEEN THE MASTER STATION AND
INTELLIGENT DEVICE STATION (AJ65BT-D75P2-S3)
14.5 Executing the Data Link
To start the data link, first power on the intelligent device station, and then the master
station.
14.5.1 Checking the data link status
The following describes how to check the operation status of the master station and
intelligent device stations under normal data link condition.
(1) Checking the master station
Check the operation status of the master station.
(a) Checking by the LED indication on the CC-Link Ver.2 board
Make sure that the LED status is as follows:
SD
RD
RUN ERR.
No error has occurred.
:ON :OFF
Data are being received.
The CC-Link Ver.2 board is operating normally.
Data are being transmitted.
(b) Checking by the CC-Link Ver.2 Utility
Check that the Board detail information on the CC-Link Ver.2 Utility is
displayed as shown below.
In data link: Normal data link is being performed.
ON (green): The CC-Link Ver.2 board is operating normally.
Normal: The CC-Link Ver.2 board is operating normally.
OFF: No error has occurred.
Содержание Q80BD-J61BT11N
Страница 2: ......
Страница 34: ...1 10 1 10 MELSEC 1 OVERVIEW MEMO ...
Страница 54: ...3 12 3 12 MELSEC 3 SPECIFICATIONS MEMO ...
Страница 124: ...5 16 5 16 MELSEC 5 PROCEDURE BEFORE STARTING THE DATA LINK MEMO ...
Страница 160: ...9 2 9 2 MELSEC 9 MELSEC DATA LINK LIBRARY MEMO 9 ...
Страница 200: ...12 16 12 16 MELSEC 12 COMMUNICATION BETWEEN THE MASTER STATION AND LOCAL STATIONS MEMO ...
Страница 212: ...13 12 13 12 MELSEC 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATION AJ65BT R2 MEMO ...
Страница 228: ...14 16 14 16 MELSEC 14 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATION AJ65BT D75P2 S3 MEMO ...
Страница 354: ...App 92 App 92 MELSEC APPENDIX Appendix 19 2 Q81BD J61BT11 121 141 147 153 19 158 103 5 91 Unit mm ...
Страница 355: ...App 93 App 93 MELSEC APPENDIX MEMO ...
Страница 361: ......