8 - 13 8 - 13
MELSEC
8 OPERATING THE UTILITY SOFTWARE
8.2.7 Operating the Memory I/O test screen
The Memory I/O test screen diagnoses the dual-port memory and I/O port used by the
CC-Link Ver.2 board.
POINT
(1) Before starting a diagnostic operation, be sure to disconnect the external cable.
(2) To switch windows during a diagnostic operation, click the Stop button to
stop the diagnosis and then switch screens.
1)
2)
5)
3)
4)
Item Description
1) Channel No.
Select the channel to be diagnosed.
2) Diagnoses
Displays the addresses of the 2-port memory and I/O port being diagnosed, the number of
diagnoses and the status.
3) Start button
Starts the 2-port memory and I/O port diagnosis on the selected channel.
4) Stop button
Stops the currently executing 2-port memory and I/O port diagnosis, and updates the count
and status.
5) Reset board button
Resets the CC-Link Ver.2 board.
Содержание Q80BD-J61BT11N
Страница 2: ......
Страница 34: ...1 10 1 10 MELSEC 1 OVERVIEW MEMO ...
Страница 54: ...3 12 3 12 MELSEC 3 SPECIFICATIONS MEMO ...
Страница 124: ...5 16 5 16 MELSEC 5 PROCEDURE BEFORE STARTING THE DATA LINK MEMO ...
Страница 160: ...9 2 9 2 MELSEC 9 MELSEC DATA LINK LIBRARY MEMO 9 ...
Страница 200: ...12 16 12 16 MELSEC 12 COMMUNICATION BETWEEN THE MASTER STATION AND LOCAL STATIONS MEMO ...
Страница 212: ...13 12 13 12 MELSEC 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATION AJ65BT R2 MEMO ...
Страница 228: ...14 16 14 16 MELSEC 14 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATION AJ65BT D75P2 S3 MEMO ...
Страница 354: ...App 92 App 92 MELSEC APPENDIX Appendix 19 2 Q81BD J61BT11 121 141 147 153 19 158 103 5 91 Unit mm ...
Страница 355: ...App 93 App 93 MELSEC APPENDIX MEMO ...
Страница 361: ......