13 - 11 13 - 11
MELSEC
13 COMMUNICATION BETWEEN THE MASTER STATION AND
INTELLIGENT DEVICE STATION (AJ65BT-R2)
13.5.2 Confirming the operation with a user program
Using a user program, confirm that the data link is being executed normally.
Use of the sample program allows the operation check in the following system
configuration.
For details on the location where the sample program is stored, refer to MELSEC Data
Link Library Reference Manual.
With the sample program, initialization, transmission and reception are available.
Terminal resistor
RS-232C module
AJ65BT-R2
Remote device station (station No. 1)
Terminal
resistor
Occupies 1 station
Q80BD-J61BT11N
Q81BD-J61BT11
Master station
+
Personal
computer
External device
ABCD
Receiving data
ABCD
Sending data
Sending
Receiving
ABCD
Receiving data
Receiving
ABCD
Sending data
Sending
Содержание Q80BD-J61BT11N
Страница 2: ......
Страница 34: ...1 10 1 10 MELSEC 1 OVERVIEW MEMO ...
Страница 54: ...3 12 3 12 MELSEC 3 SPECIFICATIONS MEMO ...
Страница 124: ...5 16 5 16 MELSEC 5 PROCEDURE BEFORE STARTING THE DATA LINK MEMO ...
Страница 160: ...9 2 9 2 MELSEC 9 MELSEC DATA LINK LIBRARY MEMO 9 ...
Страница 200: ...12 16 12 16 MELSEC 12 COMMUNICATION BETWEEN THE MASTER STATION AND LOCAL STATIONS MEMO ...
Страница 212: ...13 12 13 12 MELSEC 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATION AJ65BT R2 MEMO ...
Страница 228: ...14 16 14 16 MELSEC 14 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATION AJ65BT D75P2 S3 MEMO ...
Страница 354: ...App 92 App 92 MELSEC APPENDIX Appendix 19 2 Q81BD J61BT11 121 141 147 153 19 158 103 5 91 Unit mm ...
Страница 355: ...App 93 App 93 MELSEC APPENDIX MEMO ...
Страница 361: ......