14 - 15 14 - 15
MELSEC
14 COMMUNICATION BETWEEN THE MASTER STATION AND
INTELLIGENT DEVICE STATION (AJ65BT-D75P2-S3)
14.5.2 Confirming the operation with a user program
Using a user program, confirm that the data link is being executed normally.
Use of the sample program allows the operation check in the following system
configuration.
For details on the location where the sample program is stored, refer to MELSEC Data
Link Library Reference Manual.
With the sample program, the initialization, zero point return, positioning and jog
operation can be performed.
AJ65BT-D75P2-S3
Initialization
operation
Program execution
Initialization
Zero point return
Positioning
JOG operation
Master station
Q80BD-J61BT11N
Q81BD-J61BT11
+
Personal
computer
Intelligent device station (station No. 1)
Occupies 4 station
Terminal resistor
Positioning module
Servo
amplifier
Motor
Motor
Servo
amplifier
Zero point return operation
Positioning operation
JOG operation
Terminal
resistor
Содержание Q80BD-J61BT11N
Страница 2: ......
Страница 34: ...1 10 1 10 MELSEC 1 OVERVIEW MEMO ...
Страница 54: ...3 12 3 12 MELSEC 3 SPECIFICATIONS MEMO ...
Страница 124: ...5 16 5 16 MELSEC 5 PROCEDURE BEFORE STARTING THE DATA LINK MEMO ...
Страница 160: ...9 2 9 2 MELSEC 9 MELSEC DATA LINK LIBRARY MEMO 9 ...
Страница 200: ...12 16 12 16 MELSEC 12 COMMUNICATION BETWEEN THE MASTER STATION AND LOCAL STATIONS MEMO ...
Страница 212: ...13 12 13 12 MELSEC 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATION AJ65BT R2 MEMO ...
Страница 228: ...14 16 14 16 MELSEC 14 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATION AJ65BT D75P2 S3 MEMO ...
Страница 354: ...App 92 App 92 MELSEC APPENDIX Appendix 19 2 Q81BD J61BT11 121 141 147 153 19 158 103 5 91 Unit mm ...
Страница 355: ...App 93 App 93 MELSEC APPENDIX MEMO ...
Страница 361: ......