16 - 10 16 - 10
MELSEC
16 TROUBLESHOOTING
(1) Precautions for installing other optional board
Executing user program (including the device monitor utility) for each board
simultaneously under the following condition may cause an error. When an error
occurs in the user program, take the action shown below.
<Condition>
A personal computer into which the CC-Link Ver.2 board and other optional
board are installed and where the resources were allocated automatically by
Plug-and-Play is used.
<Action>
• Change the positions where the CC-Link Ver.2 board and other optional board
are installed.
• In the BIOS setup, exchange the IRQs between the CC-Link Ver.2 board and
other optional board or change their IRQs.
Содержание Q80BD-J61BT11N
Страница 2: ......
Страница 34: ...1 10 1 10 MELSEC 1 OVERVIEW MEMO ...
Страница 54: ...3 12 3 12 MELSEC 3 SPECIFICATIONS MEMO ...
Страница 124: ...5 16 5 16 MELSEC 5 PROCEDURE BEFORE STARTING THE DATA LINK MEMO ...
Страница 160: ...9 2 9 2 MELSEC 9 MELSEC DATA LINK LIBRARY MEMO 9 ...
Страница 200: ...12 16 12 16 MELSEC 12 COMMUNICATION BETWEEN THE MASTER STATION AND LOCAL STATIONS MEMO ...
Страница 212: ...13 12 13 12 MELSEC 13 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATION AJ65BT R2 MEMO ...
Страница 228: ...14 16 14 16 MELSEC 14 COMMUNICATION BETWEEN THE MASTER STATION AND INTELLIGENT DEVICE STATION AJ65BT D75P2 S3 MEMO ...
Страница 354: ...App 92 App 92 MELSEC APPENDIX Appendix 19 2 Q81BD J61BT11 121 141 147 153 19 158 103 5 91 Unit mm ...
Страница 355: ...App 93 App 93 MELSEC APPENDIX MEMO ...
Страница 361: ......