5 - Removal and Re-installation
ExpressCard 2000 / ExpressCard 3000| Instant Issuance Card Personalization System | Hardware Service Manual
Page 121 of 356 (
D99875607-91
)
26)
Swing the shuttle to retract it above its base.
27)
Carefully lift the hopper module out of the device. Tilt it to avoid hitting the pulley at the rear of the
device, lift the front end first, and make sure it doesn’t snag any cables, belts, or other parts on the
way out. Set the hopper module aside.
28)
If you are removing the hopper transport gearbox, locate it at the rear of the device.