Piping guidelines
Guidelines for piping are given in the Hydraulic Institute Standards available from the Hydraulic Institute
at 9 Sylvan Way, Parsippany, NJ 07054-3802. You must review this document before you install the pump.
Checklist
Check
Explanation/comment
Checked
Check that all piping is
supported independently of, and
lined up naturally with, the pump
flange.
This helps to prevent:
• Strain on the pump
• Misalignment between the pump and the drive unit
• Wear on the pump bearings and the coupling
• Wear on the pump bearings, seal, and shafting
Keep the piping as short as
possible.
This helps to minimize friction losses.
Check that only necessary fittings
are used.
This helps to minimize friction losses.
Do not connect the piping to the
pump until:
• The grout for the baseplate or
sub-base becomes hard.
• The hold-down bolts for the
pump and the driver are
tightened.
—
Make sure that all the piping
joints and fittings are airtight.
This prevents air from entering the piping system or
leaks that occur during operation.
If the pump handles corrosive
fluids, make sure that the piping
allows you to flush out the liquid
before you remove the pump.
—
If the pump handles liquids at
elevated temperatures, make sure
that the expansion loops and
joints are properly installed.
This helps to prevent misalignment due to linear
expansion of the piping.
Installation
Model HT 3196 i-FRAME Installation, Operation, and Maintenance Manual
35
Содержание HT 3196 i-FRAME
Страница 1: ...Goulds Pumps Installation Operation and Maintenance Manual Model HT 3196 i FRAME ...
Страница 2: ......
Страница 140: ...Certification CE or CE ATEX 138 Model HT 3196 i FRAME Installation Operation and Maintenance Manual ...
Страница 141: ...ATEX notification Certification CE or CE ATEX Model HT 3196 i FRAME Installation Operation and Maintenance Manual 139 ...
Страница 143: ...Certification CE or CE ATEX Model HT 3196 i FRAME Installation Operation and Maintenance Manual 141 ...
Страница 147: ......