5. Set the impeller clearance.
Refer to the Impeller clearance setting topic for more information.
6. Tighten the setscrews in the seal locking ring in order to secure the seal to the shaft.
7. Remove the centering clips from the seal.
Seal the shaft with a conventional inside-component mechanical seal
WARNING:
The mechanical seal used in an Ex-classified environment must be properly certified. Prior to startup,
make sure that all areas that could leak pumped fluid to the work environment are closed.
NOTICE:
The mechanical seal must have an appropriate seal-flush system. Otherwise, excess heat generation and
seal failure can occur.
1. Assemble the seal chamber:
a) Install a seal-chamber cover or a backplate (184) and fasten with nuts (370H) with .
370H
184
b) Check the seal-chamber cover runout.
Maintenance
Model HT 3196 i-FRAME Installation, Operation, and Maintenance Manual
111
Содержание HT 3196 i-FRAME
Страница 1: ...Goulds Pumps Installation Operation and Maintenance Manual Model HT 3196 i FRAME ...
Страница 2: ......
Страница 140: ...Certification CE or CE ATEX 138 Model HT 3196 i FRAME Installation Operation and Maintenance Manual ...
Страница 141: ...ATEX notification Certification CE or CE ATEX Model HT 3196 i FRAME Installation Operation and Maintenance Manual 139 ...
Страница 143: ...Certification CE or CE ATEX Model HT 3196 i FRAME Installation Operation and Maintenance Manual 141 ...
Страница 147: ......