Commissioning, Startup, Operation, and
Shutdown
Preparation for startup
WARNING:
• Failure to follow these precautions before you start the unit will lead to serious personal injury and
equipment failure.
• Do not operate the pump below the minimum rated flows or with the suction or discharge valves
closed. These conditions can create an explosive hazard due to vaporization of pumped fluid and can
quickly lead to pump failure and physical injury.
• Never operate the pump without the coupling guard correctly installed.
• Always disconnect and lock out power to the driver before you perform any installation or
maintenance tasks. Failure to disconnect and lock out driver power will result in serious physical
injury.
• Operating the pump in reverse rotation can result in the contact of metal parts, heat generation, and
breach of containment.
Precautions
NOTICE:
• Verify the driver settings before you start any pump.
• Make sure that the warm-up rate does not exceed 2.5°F (1.4°C) per minute.
• Risk of damage to the mechanical seal or shaft sleeve on units supplied with cartridge mechanical
seals. Prior to startup, make sure to tighten the set screws in the seal locking ring and remove the
centering clips.
You must follow these precautions before you start the pump:
• Flush and clean the system thoroughly to remove dirt or debris in the pipe system in order to prevent
premature failure at initial startup.
• Bring variable-speed drivers to the rated speed as quickly as possible.
• Run a new or rebuilt pump at a speed that provides enough flow to flush and cool the close-running
surfaces of the stuffing-box bushing.
• If temperatures of the pumped fluid will exceed 200°F (93°C), then warm up the pump prior to
operation. Circulate a small amount of fluid through the pump until the casing temperature is within
100°F (38°C) of the fluid temperature.
At initial startup, do not adjust the variable-speed drivers or check for speed governor or over-speed trip
settings while the variable-speed driver is coupled to the pump. If the settings have not been verified, then
uncouple the unit and refer to instructions supplied by the driver manufacturer.
Remove the coupling guard
1. Remove the nut, bolt, and washers from the slotted hole in the center of the coupling guard.
2. Slide the driver half of the coupling guard toward the pump.
Commissioning, Startup, Operation, and Shutdown
40
Model HT 3196 i-FRAME Installation, Operation, and Maintenance Manual
Содержание HT 3196 i-FRAME
Страница 1: ...Goulds Pumps Installation Operation and Maintenance Manual Model HT 3196 i FRAME ...
Страница 2: ......
Страница 140: ...Certification CE or CE ATEX 138 Model HT 3196 i FRAME Installation Operation and Maintenance Manual ...
Страница 141: ...ATEX notification Certification CE or CE ATEX Model HT 3196 i FRAME Installation Operation and Maintenance Manual 139 ...
Страница 143: ...Certification CE or CE ATEX Model HT 3196 i FRAME Installation Operation and Maintenance Manual 141 ...
Страница 147: ......