.030
101
For more information on how to set the impeller clearances, refer to the Impeller-clearance checks and
Impeller-clearance setting sections in Commissioning, Startup, Operation, and Shutdown.
Attach the i-ALERT
™
Condition Monitor to the pump
CAUTION:
Always wear protective gloves. The pump and condition monitor can be hot.
Tools required:
• 5/32 inch hex wrench
1. Attach the condition monitor (761B) to the bearing frame (228A) using the hex-head screw (372T)
provided.
372T
228A
761B
2. Tighten the hex-head screw with a 5/32 inch hex wrench to 6 ft-lbs (8 Nm).
Maintenance
116
Model HT 3196 i-FRAME Installation, Operation, and Maintenance Manual
Содержание HT 3196 i-FRAME
Страница 1: ...Goulds Pumps Installation Operation and Maintenance Manual Model HT 3196 i FRAME ...
Страница 2: ......
Страница 140: ...Certification CE or CE ATEX 138 Model HT 3196 i FRAME Installation Operation and Maintenance Manual ...
Страница 141: ...ATEX notification Certification CE or CE ATEX Model HT 3196 i FRAME Installation Operation and Maintenance Manual 139 ...
Страница 143: ...Certification CE or CE ATEX Model HT 3196 i FRAME Installation Operation and Maintenance Manual 141 ...
Страница 147: ......