370H
184
b) Check the seal-chamber cover runout.
Rotate the indicator through 360 degrees. If the total indicator reading is greater than 0.005 in.
(0.13 mm), determine the cause and correct the issue before you proceed.
c) Install the shaft sleeve (126).
Maintenance
Model HT 3196 i-FRAME Installation, Operation, and Maintenance Manual
113
Содержание HT 3196 i-FRAME
Страница 1: ...Goulds Pumps Installation Operation and Maintenance Manual Model HT 3196 i FRAME ...
Страница 2: ......
Страница 140: ...Certification CE or CE ATEX 138 Model HT 3196 i FRAME Installation Operation and Maintenance Manual ...
Страница 141: ...ATEX notification Certification CE or CE ATEX Model HT 3196 i FRAME Installation Operation and Maintenance Manual 139 ...
Страница 143: ...Certification CE or CE ATEX Model HT 3196 i FRAME Installation Operation and Maintenance Manual 141 ...
Страница 147: ......