Seal chamber and stuffing box cover inspection
Checklist
Perform these checks when you inspect the seal chamber and stuffing box cover:
• Make sure that these surfaces are clean:
• Seal chamber and stuffing box cover
• Mounting
• Make sure there is no pitting or wear greater than 1/8 in. (3.2 mm) deep.
Replace the seal chamber and stuffing box cover if pitting or wear exceeds this measurement.
• Inspect the machined surfaces and mating faces noted in the figures.
These images point to the areas to inspect:
184
Figure 23: BigBore
TM
chamber
184
Figure 24: Stuffing box cover
Maintenance
Model HT 3196 i-FRAME Installation, Operation, and Maintenance Manual
87
Содержание HT 3196 i-FRAME
Страница 1: ...Goulds Pumps Installation Operation and Maintenance Manual Model HT 3196 i FRAME ...
Страница 2: ......
Страница 140: ...Certification CE or CE ATEX 138 Model HT 3196 i FRAME Installation Operation and Maintenance Manual ...
Страница 141: ...ATEX notification Certification CE or CE ATEX Model HT 3196 i FRAME Installation Operation and Maintenance Manual 139 ...
Страница 143: ...Certification CE or CE ATEX Model HT 3196 i FRAME Installation Operation and Maintenance Manual 141 ...
Страница 147: ......